Web Master

Repair of Painting Works on Beam, Column, Slabs, and Wall

The purpose of this method statement is to cover the steps for repairing of painting works on beam, column, slabs, and walls etc. Overall painting subcontractor is responsible for implementation of this procedure on a project or building. Below is list of necessary tools and equipment’s. Gondola for exterior works Water jet pump Scraper Paint […]

Repair of Painting Works on Beam, Column, Slabs, and Wall Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements

Method Statement for Excavation & Backfilling for Open Foundations / Footings

Below is a brief method statement that details general procedures to be followed for excavation & backfilling of foundations, Sub-structures & Trenches for any type of the construction and road project. The method covers survey works, excavation, backfilling, compaction and area cleaning after the completion of works. Separate work method statement, will be generated by

Method Statement for Excavation & Backfilling for Open Foundations / Footings Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Roadworks
Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports

Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related standards and codes: ASTM A416/A416M: Standard Specification for Steel Strand, Uncoated Seven-Wire for

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Technical Articles
Temporary Works Standard Safety Procedure

Temporary Works Standard Safety Procedure

The purpose of this procedure is to provide safework instruction for the safe erection, dismantling and structure design of temporary works. Definitions and Abbreviations Temporary Works: Any temporary structure required to construct a permanent structure or used to support a permanent structure. TWC: Temporary Works Coordinator TWD: Temporary Works Designer TWDC: Temporary Works Design Checker

Temporary Works Standard Safety Procedure Read More »

Civil Engineering Methods, Occupational Health and Safety, Project Planning, Risk Assessment

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work will be carried out and what health and safety requirements are implemented on

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories Read More »

Construction Method Statements, Duct Works, HVAC Method Statements, Method Statements
Bored Pile (Cast-in-Situ) Construction Method Statement

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated risks involved, develop and implement adequate control measures and to provide a safe

Bored Pile (Cast-in-Situ) Construction Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Precast Post Tensioned Beam Installation Procedure

This civil method statement is prepared to state the proposed construction method for prestressing works and shall be, upon approval by the consulting engineer, distributed to all parties concerned so that the prestressing works can be carried out with the same information. The prestressing systems is STRONG FORCE (M) Multi Strand Bonded System using 15.24mm

Precast Post Tensioned Beam Installation Procedure Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements

Painting Standard Specifications for Enamel & Emulsion Painting Techniques

All paints to be used shall be those supplied by approved manufacturers. The quality of paints shall comply with MS 125 in respect of oil/ enamel paints and MS 134 in respect of emulsion paints/acrylic paint. Prior to commencement of the painting work, the Contractor shall submit the following to the client/consultant: i) Name of

Painting Standard Specifications for Enamel & Emulsion Painting Techniques Read More »

Civil Engineering Methods
error: Content is protected !!
Scroll to Top