Method of thermal insulation and Lagging for Pipe Elbow

Method Statement for Installation of Thermal Insulation on Pipes

Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause corrosion problems or process problems, for example the outdoor piping, fitting and equipment.

Method Statement for Installation of Thermal Insulation on Pipes Read More »

Duct Works, HVAC Method Statements, Method Statements, Technical Articles
Method of Statement for Protection Screed of Waterproofing Membrane

Method of Statement for Protection Screed of Waterproofing Membrane

This civil work method statement describes the brief procedure and responsibilities of site personnel who are involved in the work for protection screed of waterproofing membrane. Project manager is overall responsible for the implementation of this method during the project civil works related to Screeding works. The site engineers are responsible for proper execution, arrangement,

Method of Statement for Protection Screed of Waterproofing Membrane Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Inspection and Test Requirements for In-Situ Concrete Placement

Inspection and Test Requirements for In-Situ Concrete Placement

This procedure covers checks and quality control requirements for carrying out in-situ concrete operations. Daily concrete requirements shall be provided to the RMC supplier including quantity, mix  details, workability time, delivery rate and access arrangements. Site Engineer shall ensure that checks on the following activities take place using checklist for In-Situ Reinforced Concrete. Formwork Requirements

Inspection and Test Requirements for In-Situ Concrete Placement Read More »

Civil Engineering Methods, Construction Method Statements, Quality Management
Steel Bar Rebar Reinforcement Cutting and Bending Procedure

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the specific project contract documentation. In any circumstances where specifications are not provided or

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Road Pavement Construction Inspection Checklist

Standard Road Maintenance Routine Requirements

The works mentioned in this Section shall apply to maintenance of road and shall be carried out manually or by machinery in such a way that the quality of end product meets the specified requirements. Whenever the Specification is not clear, good engineering practice shall be applied to the satisfaction of the consulting engineer. This

Standard Road Maintenance Routine Requirements Read More »

Civil Engineering Methods, Quality Management, Roadworks
Explosive Power Tools Operation Safety Instructions

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating manual and cartridge operating manual. Hazard Identification and Risk Assessment The introduction of

Explosive Power Tools Operation Safety Instructions Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Technical Articles