Aluminium HVAC Ductwork Installation Method Statement

Below is a brief method statement that covers the duct installation of aluminium ductwork on a construction project. This procedure defines the method used to ensure hvac aluminium ducting installation has been carried out as per contract requirements and best industry practices. The procedure gives details of how the ductwork will be carried out and […]

Aluminium HVAC Ductwork Installation Method Statement Read More »

Construction Method Statements, HVAC Method Statements, Method Statements
Ductwork & Accessories Installation Method Statement

Ductwork and Accessories Installation Method Statement

Ducts in any HVAC system are used for distribution of air which can be for the purpose of cooling, providing fresh air or for the exhaust purpose. Commonly the HVAC ductwork is fabricated using GI sheets, but there are different types of air conditioning ducts available in the market. Below is a list of the

Ductwork and Accessories Installation Method Statement Read More »

Duct Works, HVAC Method Statements, Method Statements

Chilled Water Pump Testing & Commissioning Method Statement

Below is a precise testing and commissioning method statement for chilled water pumps on a project site. The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of CHW chilled water pumps. By following the guidelines

Chilled Water Pump Testing & Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning

Method Statement for Drainage Pipe Installation – PVC uPVC Drainage Piping Under / Above Ground

This method statement is applicable for all drainage pipe works underground, above ground, horizontal and vertical drainage piping for any kind of the project as specified in project specification. It is responsibility of project manager and project plumbing engineer to ensure the availability of coordinated drawings and the required materials as per the project specifications.

Method Statement for Drainage Pipe Installation – PVC uPVC Drainage Piping Under / Above Ground Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements

Nitrogen Flushing of Air Conditioning and Refrigeration Systems

Below is the standard procedure for the proper flushing of air-conditioning and refrigeration system with the use of dry nitrogen, and refrigeration equipment which require flushing of the system after exposing it to the atmosphere or during replacement of the refrigerant compressor. Responsibilities:  It is the responsibility of the A/C technician to conduct flushing of the

Nitrogen Flushing of Air Conditioning and Refrigeration Systems Read More »

HVAC Method Statements, Method Statements
Concrete Formwork Method Statement

Concrete Formwork Method Statement

The purpose of this document is to lay down the systematic procedures for the various activities required for concrete formwork to ensure that all works are carried out in accordance with the approved shop drawings and contract specifications. This civil method statement is a general outline for fabrication and use of formwork for any kind

Concrete Formwork Method Statement Read More »

Civil Engineering Methods, Method Statement for Civil Works

PTW Permit To Work Standard Work Instruction

This standard work instruction describes the system to control potentially high risk operations through the issue of a Permit to Work (PTW). Procedure applies to all parties engaged under the control of main contractor on a construction project site. Permit to Work (PTW): Is a system which ensures that all essential precautions have been taken

PTW Permit To Work Standard Work Instruction Read More »

Occupational Health and Safety, Risk Assessment