Download Method Statement for Installation of Wiring Accessories

Download package contains:

  • Method Statement
  • Checklist for Installation
  • Inspection & Testing Plan
  • Risk Assessment.

 

You only need to change project name and

insert logos etc and the same shall be

ready to be submitted for approval from consultant/clients.

Below is the list of files that are included in download package.

 

Wiring Accessories Installation Method Statement

Download Link: