The purpose of this Method Statement is to define the procedures, responsibilities, safety requirements, quality control measures, inspection criteria, and installation methodology for HVAC dampers and associated accessories.
The objective is to ensure that all HVAC dampers are installed safely, accurately, and in accordance with approved shop drawings, project specifications, manufacturer’s recommendations, applicable international standards, and authority requirements to achieve proper airflow control, fire and smoke protection, pressure regulation, and system functionality prior to testing and commissioning.
Now you can download Method Statement For Installation Of HVAC Dampers (VCD, Motorized VCD, Fire Damper, Fire Rated Motorized Damper, Smoke Motorized Damper) in editable formats.
Download package contains:
- Method Statement
- Checklist for Installation
- Inspection & Testing Plan
- Risk Assessment
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.
Below is the list of files that are included in download package.
Download Method Statement with Checklists, ITP & Risk Assessment


