Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Installation Method Statement Procedure for Car Park Boom & Barrier Arms

The Vehicle loop cables shall be laid on the drive lane for entry & exit locations, to detect vehicle presence at drive lanes. In addition, safety loops shall detect vehicle exit on the drive lane to command barrier to lower down its arm. The Vehicle loop detectors’ cables shall be pulled up to barrier locations […]

Installation Method Statement Procedure for Car Park Boom & Barrier Arms Read More »

Construction Method Statements, Electrical Method Statements, Method Statements

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves

SCOPE OF WORK: This Method Statement describes the procedure for repairing the damaged outer jacketing of cables using wrap around heat shrinkable sleeves. TOOLS  Cable preparation tools Cable manufacturer approved solvent Clean, lint free clothes Burning Torch Electrician’s tape Installation tools MATERIALS REQUIRED: The wrap around heat shrinkable cable sleeves used shall be as per approved

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves Read More »

Construction Method Statements, Electrical Method Statements, Method Statements

Testing, Commissioning, Training, Handover and DLP Strategy for a Project

Testing & Commissioning Testing & commissioning is done once all civil & MEP system installation is completed, inspected and approved. Before starting the T&C activities a comprehensive testing & commissioning plan is prepared and approval is taken from client/consultant. It is discussed and mutually agreed whether the T&C can be done on temporary power or

Testing, Commissioning, Training, Handover and DLP Strategy for a Project Read More »

Test Reports & Forms, Testing & Commissioning
AC Duct Cleaning Method Statement for HVAC Ducts & Accessories

AC Duct Cleaning Method Statement Best for HVAC Ducts & Accessories

The purpose of this ac duct cleaning method is to remove the inert suspended matter such as foreign objects, moulds etc. HVAC duct cleaning will be done until all suspended matter and loose debris are fully removed from the ducting system. Following tools shall be arranged before starting the ac duct cleaning works of HVAC

AC Duct Cleaning Method Statement Best for HVAC Ducts & Accessories Read More »

Construction Method Statements, Duct Works, HVAC Method Statements, Method Statements

Testing & Commissioning Procedure for Ventilation and General Exhaust Fans

Mechanical Pre-commissioning checks for Exhaust Fans Carefully inspect the unit and check the installation with anti vibration materials is complete. Check and ensure the shipping bolts / clamps are removed. Check tightness of all nuts / bolts, screws, fasteners etc. as applicable. Check the alignment of belts and adjust the tension (where applicable). Check the ductwork connections

Testing & Commissioning Procedure for Ventilation and General Exhaust Fans Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning

Internal Painting Method Statement

This method statement details general procedures to be followed for the internal painting work using paints from Berger at any kind of a project/building. The procedure covers preparatory works, actual application and area cleaning associated with the painting works. For Latex Emulsion Paint the sequence will be: Surface Preparations -> PVA primer 1 Coat ->

Internal Painting Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Method Statement For Repairing Screed Surface

Following equipment shall be arranged: Hand tools Air Compressor Wire brush Slow speed drill with Fosroc MR4 mortar mixing paddle Finishing Sponge & rubber gloves SURFACE PREPARATION Mark out the defective area, remove loose sand cement materials and all contamination from screed  such as dust, oil & grease if any up to the perimeter of

Method Statement For Repairing Screed Surface Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Damaged Cracked Concrete Repair Of Large Cracks

Method Statement For Damaged Cracked Concrete Repair Of Large Cracks

This procedure shall apply to the repair of all defective cracked concrete in large quantities, using high strength, free flowing, cementitious micro concrete  of size 40 – 300 mm thickness. Concrete Preparation The areas to be repaired are to be as shown on the drawings or as indicated by the Client/Consultant. Affected areas are to be

Method Statement For Damaged Cracked Concrete Repair Of Large Cracks Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements