Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines

General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines

Following is a precise chemical cleaning procedure that will ensure the internal and external cleanliness and protection of the pipes before the piping process unit is put into service. Scope of work covers all the horizontal and vertical pipelines through all the areas in the project and buried underground lines in the infrastructure area as […]

General Instructions and Method Statement for Chemical Cleaning of Carbon Steel Pipelines Read More »

HVAC Method Statements

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset

General Requirements Batteries, fuel & auxiliary power must be isolated before carrying out initial inspection. Ensure that the control switch is in the OFF position and emergency switch is pressed. Ensure that the panel has the correct fascia and labels. Note: All test sheets containing test values shall be forwarded to concern parties for records All

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
tig-welding-procedure

Types of Welding WPS, CWB Arc Welding Tig Welding

Before going to the welding procedure in full detail let’s first understand what is welding? The term welding is used in mechanical engineering when we are joining two or more pieces of any material typically metal by application of heat, pressure or combination of both. This is simplest definition for welding. Mostly the term is

Types of Welding WPS, CWB Arc Welding Tig Welding Read More »

HVAC Method Statements, Stainless Steel Fabrication

Welding Procedure | Arc Welding Machine

This welding procedure or Method statement describes in detail the welding process for pipe work and the welder’s qualification test procedures. This includes addressing programs for implementing commitments regarding the quality of welding works. Scope and Purpose This document outlines the method for executing welding procedure for pipe work and welding procedure qualification test for ARC Welder. This

Welding Procedure | Arc Welding Machine Read More »

HVAC Method Statements, Stainless Steel Fabrication

Critical Site Electrical Testing Requirements for Electrical Contractors

Below we have given few guidelines for electrical testing which can help electrical engineers & electrician to understand what are general requirements for doing the testing & commissioning of electrical systems at any kind of project or facility. All electrical plants & equipment’s are inspected and tested during and after installation as applicable on site

Critical Site Electrical Testing Requirements for Electrical Contractors Read More »

Testing & Commissioning
structured cabling system testing requirements

Structured Telephone & Data Cabling System Testing Requirements

All cables and termination hardware shall be 100% tested for defects in installation and to verify structured cabling system performance under installed conditions according to the requirements of ANSI/TIA 1152, ANSI/TIA-568 C.2 and IS&T. All pairs of each installed cable shall be verified prior to system acceptance. Any defect in the cabling system installation including

Structured Telephone & Data Cabling System Testing Requirements Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Installation Procedure for Ticketing Dispenser

Ticketing dispenser shall be installed in retail parking entry point. Access to the car park will be granted via ticketing dispenser with bar code parking ticket. Foundations shall be prepared as per the recommendations of manufacturer. The foundation dimensions shall be of HxWxD: 600x600x600mm. The concrete to be a design mix in accordance with BS

Installation Procedure for Ticketing Dispenser Read More »

Construction Method Statements, Electrical Method Statements, Method Statements

Installation Procedure for Vehicle Induction Loop System

The preformed or saw-cut vehicle induction loop shall be buried in Entry and Exit drive lanes as per the approved shop drawings and the project requirements. The loop shall be a continuous run of wire that enters and exits from the same point and end up at the loop detector which powers up the loop.

Installation Procedure for Vehicle Induction Loop System Read More »

Construction Method Statements, Electrical Method Statements, Method Statements