Automatic Transfer Switch Testing Requirements

Automatic Transfer Switch Testing Requirements

As part of the Field Quality Control as per specification clauses, testing and commissioning of the ATS Panel will be carried out as per the approved method statement under the direct supervision of factory authorized service representative. Below are standard ATS testing requirements that shall be considered while doing the electrical testing and commissioning activities. […]

Automatic Transfer Switch Testing Requirements Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing

The purpose of this method statement for reinforcement works is to lay down the systematic procedures for the various activities required for installation of reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings, bar bending schedule and project specifications. This method of statement covers the general procedures

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
method statement for electrical wiring installation

Method Statement for Electrical Wiring Installation

Below is a precise method statement for electrical wiring installation for any kind and size of project. This work method statement explains and covers the wiring through conduits and its termination to the equipment / boards etc. Required Tools Pulling Rope Lubricant Markers Masking Tape Quality & Safety Requirements Quality control on site will be

Method Statement for Electrical Wiring Installation Read More »

Electrical Method Statements, Method Statements

Welding Method Statement Prerequisites

There are many different welding processes, but the most commonly used in the construction industry are gas welding and electric arc welding. In order to ensure that all welding works takes place in a safe manner, the suitability of the following should be ensured: A-  The Arc welders B-   The working welding equipment C-   The

Welding Method Statement Prerequisites Read More »

HVAC Method Statements, Stainless Steel Fabrication
Electrical Switchgear Installation Method Statement for 11KV HV Panel

Automatic Transfer Switch & Bypass Isolation Switch Testing & Commissioning

The purpose of this electrical method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant ATS operators manual and User’s guide. By following this procedure contractor shall ensure that the method used for testing and

Automatic Transfer Switch & Bypass Isolation Switch Testing & Commissioning Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Underground Piping Fabrication and Laying Method Statement

Purpose of this mechanical work procedure is to provide guide lines to carry out underground piping fabrication and laying and to ensure that proper quality control and documentation are maintained at project site. The scope of this procedure covers fabrication, installation and relevant inspection for all underground piping works including relevant civil works at the

Underground Piping Fabrication and Laying Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements, Pressure Testing, Roadworks
Installation Testing & Commissioning Of BMS Building Management System

Building Management System BMS Installation Testing and Commissioning Method Statement

Below is a precise and best method of statement that is applicable for installation, testing & commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The scope of works includes the delivery to site, installation, testing & commissioning of the BMS system as described in the project

Building Management System BMS Installation Testing and Commissioning Method Statement Read More »

Building Management System, HVAC Method Statements, Method Statements, Testing & Commissioning