Plumbing Method Statements

Sanitary Wares Installation Method Statement

If you need to learn the method for installation of sanitary ware fittings, then you can use step wise procedure as per below method statement. Here are brief sanitary wares installation instructions. Storage of Sanitary Fittings Upon completion of receiving QC inspection, segregate the sanitary ware model / size wise and store accordingly for easy […]

Sanitary Wares Installation Method Statement Read More »

Plumbing Method Statements
Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines

Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines

The purpose of this hydrostatic testing procedure is to list out various steps involved in hydrostatic pressure testing, pigging, draining, swabbing and drying of pipelines for any kind and size of pipeline project in line with the project specifications and applicable standards and regulations. Scope of work covers the water supply quality and treatment, Internal

Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines Read More »

Plumbing Method Statements

Download Method Statement For Testing & Commissioning of Laboratory Gas System

 Download Package Contains the Method Statement + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included in download package. The

Download Method Statement For Testing & Commissioning of Laboratory Gas System Read More »

Plumbing Method Statements, Testing & Commissioning

Method Statement for Hydrostatic Testing of Metallic Pipework

The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at the project and to be followed for all piping works at site. Prior

Method Statement for Hydrostatic Testing of Metallic Pipework Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements, Pressure Testing, Testing & Commissioning
Hot Water Calorifier Testing and Commissioning Method Statement

Hot Water Calorifier Installation Testing and Commissioning Method Statement

This method statement is applicable for the installation testing and commissioning of hot water calorifier or water heater for any kind of building or projects. Arrange below tools before start of the work: Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to

Hot Water Calorifier Installation Testing and Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning
Disinfection and Flushing of Water Mains

Disinfection and Flushing of Water Mains

Purpose of this plumbing method statement is to ensure that disinfection and flushing of water mains and related pipe lines are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented for the

Disinfection and Flushing of Water Mains Read More »

Plumbing Method Statements, Testing & Commissioning
Water Booster Pump Installation Testing and Commissioning Method Statement

Water Booster Pump Installation Testing and Commissioning Method Statement

Below is a precise method of statement for water pump or booster pump installation including the testing and commissioning steps. Make sure that proper clearance is available from civil side before commencement of water pump installation works. Ensure that the work area is clean and safe for carrying out the activities. Also prior to start

Water Booster Pump Installation Testing and Commissioning Method Statement Read More »