Plumbing Method Statements

Disinfection and Flushing of Water Mains

Disinfection and Flushing of Water Mains

Purpose of this plumbing method statement is to ensure that disinfection and flushing of water mains and related pipe lines are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented for the […]

Disinfection and Flushing of Water Mains Read More »

Plumbing Method Statements, Testing & Commissioning
Water Booster Pump Installation Testing and Commissioning Method Statement

Water Booster Pump Installation Testing and Commissioning Method Statement

Below is a precise method of statement for water pump or booster pump installation including the testing and commissioning steps. Make sure that proper clearance is available from civil side before commencement of water pump installation works. Ensure that the work area is clean and safe for carrying out the activities. Also prior to start

Water Booster Pump Installation Testing and Commissioning Method Statement Read More »

Plumbing Method Statements, Testing & Commissioning

Method of Statement For Installation of Compressed Air Piping System for Chillers

1. PURPOSE This method of statement covers the on construction project site installation of the compressed air piping system for the operation of the chillers. This method statement covers following type of works: Power Plant Compressed Air Systems Factory assembled packaged air compressor complete with: –  Rotary screw air compressor –  Receiver –  Filtration facilities – 

Method of Statement For Installation of Compressed Air Piping System for Chillers Read More »

Plumbing Method Statements
Underground Drainage Pipe Installation Method Statement

Underground Drainage Pipe Installation Method Statement

The purpose of this plumbing method statement is to describe the methodology for underground laying of UPVC pipes as per the contract specifications and approved drawings, including the backfilling for the site facilities and to detail the steps to be taken to meet the quality and HSE requirements of the project. Method statement is applicable

Underground Drainage Pipe Installation Method Statement Read More »

Plumbing Method Statements
Method Statement for Condensate Drain Piping Installation Insulation & Testing (UPVC + GI)

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI)

This method statement covers on site installation of all condensate UPVC pipes for fan coils drains and galvanized pipework for AHU drains, including supports, expansion and anchor points for the condensate drainage system and insulation of the galvanized steel and upvc pipework. The mechanical method statement defines the method that will be used to ensure

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI) Read More »

Method Statements, Plumbing Method Statements, Pressure Testing, Testing & Commissioning
Water Leak Detection System Testing & Commissioning Method of Statement

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case of any contradictory matters that may arise. Purpose of this method is to

Water Leak Detection System Testing & Commissioning Method of Statement Read More »

Building Management System, Electrical Method Statements, Method Statements, Plumbing Method Statements, Testing & Commissioning
Cathodic Protection System for Storage Tanks Installation Method Statement

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the best quality workmanship for the scope of work. All project site, QA/QC and

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure Read More »

Construction Method Statements, Method Statement for Civil Works, Method Statements, Plumbing Method Statements, Stainless Steel Fabrication
jointing procedure using solvent cement

Installation Method Statement for Water Feature Piping Equipment and Accessories

Below is a brief method statement that covers installation of water feature equipment’s and accessories, in accordance with project specifications and manufacturer’s installations. MEP project manager, engineers site supervisors shall have overall responsibility for adherence to the approved method statement, project quality and site safety plan. They shall ensure that adequate resources and personnel are

Installation Method Statement for Water Feature Piping Equipment and Accessories Read More »

Plumbing Method Statements
Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

This plumbing method statement covers the nature and type of work for drainage outlets stainless steel shower gullies for the project as per site requirements. Method statement also covers frequency of which inspections are to be carried out. All documentary requirements for the installation works will be submitted for approval of consultant and this will

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements