This method statement describes in detail the installation of fire protection services at any project. The procedure covers the following activities that are also supported by the diagrams and illustrations. Fire Protection Riser Pipe Installation Rigid Coupling Installation Mechanical-T Installation Flexible Coupling
Read Complete Method
This method is for installation and maintenance of wafer type butterfly valve or lug style butterfly valve with a cast iron body construction, SS stem and disc and either EPDM, BUNA-N or Viton liners. Although the procedure is specifically provided for bi-Torq
Read Complete Method
This pipeworks procedure is applied to all the cast-in pipeworks (mild steel or ductile iron) for the project site in water treatment facility. The contents or procedures provided in this document are based on the general good water industry practices and manufacturer
Read Complete Method
Strainers are installed to prevent foreign matter e.g. scale and dirt causing damage to pipeline equipment. Service temperature and pressure indicated on the identification plate or body marking should not be exceeded. Crane strainers have not been designed as fire safe pressure
Read Complete Method
Dear engineers we are giving below a complete method statement that can be helpful for the installation of vertical turbine firefighting pump for any project. Before start of the work ensure that all latest approved related documents like drawings are available for
Read Complete Method
When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required
Read Complete Method
Pump shall be stored on a flat surface in well ventilated storage area. Inlet and outlet flange blanks shall not be removed until ready for connection to pipe work. Manufacturer’s instructions shall be strictly followed as applicable. If the pumps are stored for
Read Complete Method
Below procedure for installation of drainage pipe is very useful for all kind of projects and buildings of any size. First step is the procurement of pipes after which these shall be delivered on the site. When off-loading, pipes shall be lowered
Read Complete Method