2021
Aug
2

Fire Stop Work Installation & Application Method Statement

Method Statement for Installation of Fire Stop Work

Scope: This method statement covers the installation of Hilti Fire stop Wok which is also applicable for any other brand of fire stop system by integrating their specific requirements for effective fire stop application. References:  Approved Project Quality Plan Approved Project HSE

2021
Jun
17

Safe Operation of Abrasive Wheels / Power Tools For Cutting & Grinding

Safe Operation of Abrasive Wheels Power Tools For Cutting & Grinding

The purpose of this standard HSE procedure is to provide guidance on the safe operation and use of abrasive wheels used as high speed power tools for grinding and cutting operations on the construction sites or in the offices and house hold.

2021
May
30

Method Statement for Casting of Capping Beam for Shoring Piles

Method Statement for Casting of Capping Beam for Shoring Piles

The purpose and aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the capping beam work in compliance to standard and good practice at all stages and activities in the construction of

2021
Apr
11

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

The objective of this method statement is to set down the procedures that are involved in the safe erection, operation and dismantling of a slip form shuttering, applicable for the construction of core for the project building. Roles and Responsibilities Project manager

2020
Jul
29

Method Statement for Preparation and Construction Of Cast In Place Concrete Works for Substructures

The purpose of this civil work method statement is to define the procedure for the preparation and construction of Cast in Place Concrete Works for substructures in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and

2020
Jun
30

Pile Cutting & Trimming Method Statement

The purpose of this Method Statement is to define the procedure for the cutting of piles to the approved cut off level. General sequence of work may include: Auger fitted with appropriate head Auger drilled into ground to required depth. Steel reinforcement

2020
Mar
4

Roof Trusses Fabrication Safe Work Method Statement SWMS

Roof Trusses Fabrication swms

The sub-contractor or person doing the work is responsible for carrying out a particular action, as listed in this safe work method statement SWMS. The supervisor is responsible to ensure that the sub-contractor or person doing the work is competent and satisfied