Scope: This method statement covers the installation of Hilti Fire stop Wok which is also applicable for any other brand of fire stop system by integrating their specific requirements for effective fire stop application. References: Approved Project Quality Plan Approved Project HSE
Read Complete Method
The purpose of this standard HSE procedure is to provide guidance on the safe operation and use of abrasive wheels used as high speed power tools for grinding and cutting operations on the construction sites or in the offices and house hold.
Read Complete Method
The purpose and aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the capping beam work in compliance to standard and good practice at all stages and activities in the construction of
Read Complete Method
The objective of this method statement is to set down the procedures that are involved in the safe erection, operation and dismantling of a slip form shuttering, applicable for the construction of core for the project building. Roles and Responsibilities Project manager
Read Complete Method
The purpose of this civil work method statement is to define the procedure for the preparation and construction of Cast in Place Concrete Works for substructures in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and
Read Complete Method
The purpose of this Method Statement is to define the procedure for the cutting of piles to the approved cut off level. General sequence of work may include: Auger fitted with appropriate head Auger drilled into ground to required depth. Steel reinforcement
Read Complete Method
The sub-contractor or person doing the work is responsible for carrying out a particular action, as listed in this safe work method statement SWMS. The supervisor is responsible to ensure that the sub-contractor or person doing the work is competent and satisfied
Read Complete Method
This method statement describes a proper work procedure shall be carried out during the backfill Work of soil. Earthwork forms a part of the installation procedures of box culverts, retaining walls, foundations, and substructures. In order to ensure an adequate foundation for such
Read Complete Method