Method Statement for Civil Works

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Ceiling Spray Plaster Works Method Statement

Ceiling Spray Plaster Works Method Statement

Below is precise civil work method statement that details general procedure to be followed for ceiling spray plaster works at any kind and size of project. The procedure includes preparatory works & method of ceiling spray application. Arrange below tools and equipment before starting the ceiling spray paint and spray plaster activities: Wire brush Skimmer […]

Ceiling Spray Plaster Works Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Occupational Health and Safety
Lifting Operations Method of Statement Download

Download Lifting Operations Standard Method Statement in editable MS Word Format

Download Lifting Operations Standard Method Statement in editable MS Word format with all necessary forms and formats. You only need to add your company logo and project details etc. and your safety document is ready for submission and approval from client/consultant. This standard lifting activity instruction outlines the minimum requirements for the use, operation and

Download Lifting Operations Standard Method Statement in editable MS Word Format Read More »

Method Statement for Civil Works, Occupational Health and Safety, Risk Assessment
Installation method statement for Curtain Wall

Installation of Glazed Aluminum Curtain Wall & Composite Cladding

You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be obtained and site dimensions shall be verified before start of any activities on

Installation of Glazed Aluminum Curtain Wall & Composite Cladding Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Method Statement For Installation Of Automatic Aluminium Sliding Door

Aluminum Sliding Doors Installation Method of Statement

Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. Ensure that shop drawings is complete and method of aluminium door fixation, details of aluminium units is approved

Aluminum Sliding Doors Installation Method of Statement Read More »

Aluminium & Glass Work Methods, Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Civil Method Statement for RCC Columns and Shear Wall Construction

Below is a general method statement for illustrative purpose, there shall be different values for different parameters depending upon the type of project and climatic situations, which should be followed all the time. EQUIPMENT’S & TOOLS REQUIRED Hand saw, wire cutter, brush, Shovel Steel Brush Air compressor Plumb bob Line dory Concrete Pump Vibrator Trowel Spirit

Civil Method Statement for RCC Columns and Shear Wall Construction Read More »

Method Statement for Civil Works
Method Statement for Scaffolding, Formwork, Rebar Installation and Concreting

Method of Statement for Formwork, Rebar Installation and Concreting

Below is a precise civil work method of statement that covers the detailed procedure for the scaffolding / formwork, rebar installation and concreting operation applicable for footing, pedestals and pile caps etc. Also to explain how footing, pile caps, trenches, grade beam and grade slab work shall be carried out under controlled conditions. Tools &

Method of Statement for Formwork, Rebar Installation and Concreting Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Construction Methodology for Underground Services Protection

Construction Methodology for Underground Services Protection

Purpose of below safety method statement is to provide instructions for ensuring the safe operations involved with ground penetrations so that underground services are not damaged and also to ensure the safety of workers. Overall the project manager is having responsibilities for the implementation of this standard safety procedure. Hazard Identification and Risk Assessment a)

Construction Methodology for Underground Services Protection Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Plastering Method Statement

Plastering Method Statement

Below is a precise plastering work method statement that is very useful for civil engineers to understand how best quality plaster work can be done. This procedure covers the methodology to be followed for carrying out plastering in line with the approved technical project civil specifications. Below are the plastering tools or plastering equipment involved in

Plastering Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
error: Content is protected !!
Scroll to Top