2022
Nov
17

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports

Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related

2022
Sep
28

Bored Pile (Cast-in-Situ) Construction Method Statement

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated

2022
Aug
21

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Cathodic Protection System for Storage Tanks Installation Method Statement

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the

2022
Apr
14

General Civil Work Method Statement for Roads & Building Construction

Setting Out the Layout Refer to the final layout drawing prepared with reference to the actual demarcation, set back adjustments, final levels and other development works. Check if the site is cleaned and leveled properly by cutting or filling. Start the layout

2022
Jan
27

Method of Statement for Protection Screed of Waterproofing Membrane

Method of Statement for Protection Screed of Waterproofing Membrane

This civil work method statement describes the brief procedure and responsibilities of site personnel who are involved in the work for protection screed of waterproofing membrane. Project manager is overall responsible for the implementation of this method during the project civil works

2022
Jan
5

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

Steel Bar Rebar Reinforcement Cutting and Bending Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the

2021
Dec
19

Explosive Power Tools Operation Safety Instructions

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating

2021
Oct
10

Excavation Work Guidelines for Irrigation and Water Supply Projects

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is