Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Demolition-Method-Statement

Method Statement for Demolition Works

Below is precise method statement for demolition works that has been prepared to demonstrate the safe working method for the soft strip of internal fixtures/fixings and identified items, asbestos removal and demolition of the existing structure. This safework method is to be read in conjunction with provided drawings and Hazard surveys. This method statement is […]

Method Statement for Demolition Works Read More »

Civil Works Method Statements

Download Method Statement for Anti Termite Treatment

Download Method Statement for Anti Termite Treatment  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that are included

Download Method Statement for Anti Termite Treatment Read More »

Civil Works Method Statements
Method of Statement for Protection Screed of Waterproofing Membrane

Download Method Statement for Water Proofing Sub Structure

Professional Substructure Water Proofing Method Statement Ensure leak-free construction and consultant-approved waterproofing works with this professionally prepared Substructure Water Proofing Method Statement package. This complete documentation package is designed for contractors, waterproofing specialists, QA/QC engineers and project teams handling residential, commercial and industrial waterproofing applications. The package includes all required procedures, quality forms, inspection documents

Download Method Statement for Water Proofing Sub Structure Read More »

Civil Works Method Statements
Earthworks Method Statement

Earthworks Method Statement

This method statement for earthworks defines requirements for civil work related activities, but it doesn’t cover the earthwork activities related to underground piping, conduits and ducts which are covered under different earthworks method statements. All the earthworks shall be done in accordance with applicable standards, specifications, regulations and Client’s reference documents for the project. Terms

Earthworks Method Statement Read More »

Civil Works Method Statements
Micro Pile Installation and Pile Test Method of Statement

Micro Pile Installation and Pile Test Method of Statement

Scope of this work method statement shall apply on the reinforced concrete works and the objective is to define and establish the work method of statement for the reinforced concrete work for the installation of micro pile. The piling installation work shall be done in compliance with construction drawings and contract specifications. Following personnel are

Micro Pile Installation and Pile Test Method of Statement Read More »

Civil Works Method Statements
Scaffolding Method Statement

Scaffolding Method Statement

Below is a precise method statement for scaffolding installation for any kind of project. The following method statement is written to provide a safe and efficient system of work for the installation of general working scaffold to all areas of construction sites within the project. It will also cover all scaffold adaption’s to general scaffold

Scaffolding Method Statement Read More »

Civil Works Method Statements, Occupational Health and Safety