Category Archives: Method Statement for Civil Works

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Method Statement for Assembling Erection Installation & Management of Mast Climber

The Scope of this method statement covers all operations and associated activities involved in safe and efficient management of Mast Climber including assembling, erection, and installation for efficient and effective utilization in execution of project works. Following equipment shall be arranged: Tower crane Flat bed Lorries Safety harnesses, Helmet Chain blocks, power tools as required… Read More »

Method Statement for Installation of Roof Shading Louvers With Aluminium Cladding

Before starting the construction work, ensure that all necessary work permit and safety requirements are complete. Supervisor to check that safety personnel is available to monitor the construction activity before start of work. HSE site engineer/office will ensure monitoring of the applicable PPE and especially the safety harness for all persons concerned with working at… Read More »

Construction Method Statement for Building Construction Project

Method statement for construction project is a mandatory requirement even sometimes at the pre-qualification stage of a construction contractor. Any reputable building construction company will follow best construction methods in order to provide best quality of work.  Many old companies are always maintaining a good documentation system hence ensuring that the method statement for construction project… Read More »

Concrete Repair Method Statement (Structural Lifting, Shotcrete, Epoxy)

Concrete repair refers to modification of structure which is damage in its appearance or serviceability. It also involves to restore the structure partly or wholly, the pre-existing characteristics of serviceability, load-bearing capacity and if necessary, to improve its durability. Concrete structures deteriorate due to a number of processes leading to cracking and spalling of the… Read More »

Method Statement for Ground Preparation of Excavations & Service Trenches

This document covers excavation and ground preparation for the roadway and service trenches and shall include all excavation, shaping and sloping necessary for the construction, preparation and completion of all subgrade, shoulders, slopes, gutters, intersections, approaches, entrances and trenches in conformity to the alignment, grades, and cross-sections shown on the drawings or established by the… Read More »

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams

Prior transferring materials from lay down, the foreman shall make a materials inventory at the lay down area as per approved shop drawings if the all materials required for the passenger’s elevator hooks, hook beams and divider beams are all available at site. If found the materials available at site, the foreman shall take permission… Read More »