Download Cooling Tower Installation Method Statement Package

Professional Method Statement for Cooling Tower Installation & HVAC QA/QC Documentation Looking for a complete and consultant-approved Cooling Tower Installation Method Statement package? This professionally prepared documentation package is specially designed for HVAC contractors, MEP companies, commissioning engineers and QA/QC teams involved in installation of cooling towers for commercial, industrial and infrastructure projects. The package […]

Download Cooling Tower Installation Method Statement Package Read More »

HVAC Method Statements

Download Method Statement for Testing & Commissioning of Fuel Oil System

Download package contains the Method Statement + Checklist for Testing & Commissioning + Inspection & Testing Plan + Quality Control Procedure QCP +  Risk Assessment   You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that

Download Method Statement for Testing & Commissioning of Fuel Oil System Read More »

Plumbing Method Statements, Testing & Commissioning
Standard Procedure for Management of Construction Equipment Project Plant Assets

Standard Procedure for Management of Construction Equipment Project Plant Assets

This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when suitable hire/rental equipment is not available in the market place, and where an

Standard Procedure for Management of Construction Equipment Project Plant Assets Read More »

Civil Works Method Statements
Inspection and Test Requirements for In-Situ Concrete Placement

Method Statement for Formwork, Reinforcement and Concrete Works

Below is a precise method statement for formwork, reinforcement and concrete works, that describes the practices and methods to be used with regards to placing, curing and defect rectification of concrete works & blinding concrete. Prior to the placing of any concrete or concrete pouring all quality checks are to be completed and the “approval

Method Statement for Formwork, Reinforcement and Concrete Works Read More »

Civil Works Method Statements

Quality Management Procedure for Business Development – Sample

Below is a complete management procedure for business development, that can be used for any company by making little modifications. The procedure provides a basic structure for more inclusions depending upon the business type. Mostly marketing or business development departments are the owner of this procedure, both departments are working collectively to achieve the business

Quality Management Procedure for Business Development – Sample Read More »

Quality & Project Management
Mast Climber Installation Method statement

Method Statement for Assembling Erection Installation & Management of Mast Climber

The Scope of this method statement covers all operations and associated activities involved in safe and efficient management of Mast Climber including assembling, erection, and installation for efficient and effective utilization in execution of project works. Following equipment shall be arranged: Tower crane Flat bed Lorries Safety harnesses, Helmet Chain blocks, power tools as required

Method Statement for Assembling Erection Installation & Management of Mast Climber Read More »

Civil Works Method Statements, Occupational Health and Safety
Temporary Works Standard Safety Procedure

Temporary Works Standard Safety Procedure

The purpose of this procedure is to provide safework instruction for the safe erection, dismantling and structure design of temporary works. Definitions and Abbreviations Temporary Works: Any temporary structure required to construct a permanent structure or used to support a permanent structure. TWC: Temporary Works Coordinator TWD: Temporary Works Designer TWDC: Temporary Works Design Checker

Temporary Works Standard Safety Procedure Read More »

Occupational Health and Safety
error: Content is protected !!
Scroll to Top