Method Statement for Earthwork Related to Track Work

Before start of work, following equipment and machinery shall be arranged for earthwork and monitoring. Excavators Dump Trucks Bull Dozers Compactor Rollers Settlement Gauges/Settlement Markers Survey Equipment To begin with, licensed surveyor is required to establish the boundary and the temporary bench mark and existing ground level (EGL) all these have to be confirmed by

Method Statement for Earthwork Related to Track Work Read More »

Civil Works Method Statements
Air Balancing Procedure for HVAC System FCU AHU Exhaust Fans & Pressurization Unit

Download Method Statement for Air & Water Balancing

Complete TAB Procedure Package with Testing, Commissioning, ITP & QA/QC Documentation Download a professionally prepared Method Statement for Air & Water Balancing package developed for HVAC contractors, TAB specialists, commissioning engineers, MEP companies, QA/QC professionals, and construction teams involved in HVAC testing and commissioning projects. This editable document package provides complete procedures for Testing, Adjusting

Download Method Statement for Air & Water Balancing Read More »

HVAC Method Statements, Testing & Commissioning
Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports

Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related standards and codes: ASTM A416/A416M: Standard Specification for Steel Strand, Uncoated Seven-Wire for

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports Read More »

Civil Works Method Statements, Technical Articles

Final Distribution Boards Testing Report Checklist

The checklist or test report for mdb, smdb and fdb can be used for testing and commissioning purpose as per the below given template. There is one another page on our website that provides full list of applicable tests and respective method statement for LV Switchgear installation and testing of all components. You can download

Final Distribution Boards Testing Report Checklist Read More »

Templates Reports & Forms, Testing & Commissioning
tig-welding-procedure

Download Welding Procedure Specification WPS & Procedure Qualification Record PQR

Let us first understand what is wps? A Welding Procedure Specification (WPS) is a formal written document describing welding procedures, which provides direction to the welder or welding operators for making sound and quality production welds as per the applicable code requirements . The purpose of the wps document is to guide welders to perform

Download Welding Procedure Specification WPS & Procedure Qualification Record PQR Read More »

HVAC Method Statements

Download Method Statement For Installation of Wire Screen

Download Method Statement For Installation Of Wire Screen  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that

Download Method Statement For Installation of Wire Screen Read More »

Civil Works Method Statements
error: Content is protected !!
Scroll to Top