Steel Bar Rebar Reinforcement Cutting and Bending Procedure

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure

The scope of this procedure covers the control required for cutting, bending and fixing of steel reinforcement bars, including scheduling and dimensioning. All fixing, cutting and bending of reinforcement bars will be carried out in accordance with the specification detailed in the specific project contract documentation. In any circumstances where specifications are not provided or […]

Steel Bar Rebar Reinforcement Cutting Bending and Fixing Procedure Read More »

Civil Works Method Statements

Installation of Electrical Systems for HVAC Wild Air Cooling of Projects

This method statement details the method related to sequence of installation of electrical works in order to achieve the wild air cooling for under construction building of large projects. The installation of electrical works such as panel installation comprises the following activities. Site Clearance. Installation of necessary containment system. Area clearance for Electrical Room, Plant

Installation of Electrical Systems for HVAC Wild Air Cooling of Projects Read More »

HVAC Method Statements
Method Statement for Oil Storage Tanks Calibration

Method Statement for Oil Storage Tanks Calibration

Tank Calibration is the process of determining the volumetric content of a tank per unit height of liquid. This procedure shall be intended for calibration of Oil Storage Tanks. The calibration shall be carried out by Optical Reference Line Method (ORLM) in accordance with API Standards i.e.  API 2550, Section 2B and ISO 7507, Part 2. Condition for Measurements

Method Statement for Oil Storage Tanks Calibration Read More »

Civil Works Method Statements, Technical Articles

Laboratory Air Flow Control System & Fumes Hood Monitoring Testing and Commissioning

Below is the method statement description for performing the testing and commissioning of laboratory air monitoring and fumes hood system for any type of chemical and research laboratory. Scope of this method statement is testing and commissioning of laboratory air flow control system including the fumes hood monitoring system. Testing and commissioning shall ensure the

Laboratory Air Flow Control System & Fumes Hood Monitoring Testing and Commissioning Read More »

HVAC Method Statements, Testing & Commissioning
Bulldozer and Excavator Track Replacement Standard Procedure

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure

Below is the standard procedure that is helpful for project maintenance team for maintenance and track replacement for bulldozers and excavators. This instruction shall apply to all track replacement operations and other preventive maintenance actions for bulldozers, graders and excavators under the control of the contractor. General Requirements a) Clean the unit before service. b)

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure Read More »

Civil Works Method Statements, Roadworks
error: Content is protected !!
Scroll to Top