Detailed programming of all MEP work activities will be prepared in full coordination with the main contractors programme. Builder’s works drawings will be prepared to show all openings sleeves and cast in items, Wherever necessary back up calculations will be prepared and submitted
Read Complete Method
Ticketing dispenser shall be installed in retail parking entry point. Access to the car park will be granted via ticketing dispenser with bar code parking ticket. Foundations shall be prepared as per the recommendations of manufacturer. The foundation dimensions shall be of
Read Complete Method
The preformed or saw-cut vehicle induction loop shall be buried in Entry and Exit drive lanes as per the approved shop drawings and the project requirements. The loop shall be a continuous run of wire that enters and exits from the same
Read Complete Method
The Vehicle loop cables shall be laid on the drive lane for entry & exit locations, to detect vehicle presence at drive lanes. In addition, safety loops shall detect vehicle exit on the drive lane to command barrier to lower down its
Read Complete Method
SCOPE OF WORK: This Method Statement describes the procedure for repairing the damaged outer jacketing of cables using wrap around heat shrinkable sleeves. TOOLS Cable preparation tools Cable manufacturer approved solvent Clean, lint free clothes Burning Torch Electrician’s tape Installation tools MATERIALS REQUIRED:
Read Complete Method
Testing & Commissioning Testing & commissioning is done once all civil & MEP system installation is completed, inspected and approved. Before starting the T&C activities a comprehensive testing & commissioning plan is prepared and approval is taken from client/consultant. It is discussed