Download Method Statement For Testing & Commissioning of DX Split Units

Download Method Statement For Testing & Commissioning of DX Split Units Now you can Download Method Statement For DX Split Units T&C   The files are in word/excel format and instantly available after you pay the cost of only 2.99$. Download package contains the Method Statement + Checklist for T&C + Inspection & Testing Plan + Risk Assessment.… Read More »

Download Method Statement For Installation of Diesel Generator Set

Download Method Statement For Installation of Diesel Generator Set Now you can Download Method Statement For DG Set Installation   The files are in word/excel format and instantly available after you pay the cost of only 2.99$. Download package contains the Checklist for Installation + Inspection & Testing Plan + Risk Assessment.   You only need to change project… Read More »

Download Method Statement For Installation of Grills Diffusers Disc Valves and Louvers

Download Method Statement For Installation of Grills, Diffusers, Louvers and Disc Valves Now you can Download Method Statement For Grills & Diffusers Installation   The files are in word/excel format and instantly available after you pay the cost of only 2.99$. Download package contains the Checklist for Installation + Inspection & Testing Plan + Risk Assessment. You only… Read More »

METHOD STATEMENT FOR BRAZING & JOINTING OF COPPER PIPES

Below is a brief method statement for copper pipe installation and brazing for any kind of project. Below is list of mandatory tools and equipment’s that are useful for this activity. Tool box for Mechanical/Hand Tools Leveling Instrument Silver Brazing Rods Blow-Torch or Heating Torch Thermometer (Heating gauge indicator if any) Grinding Machine, Drilling machine… Read More »

Testing and Commissioning Method Statement For Drainage System

Below is the step wise procedure for Testing and Commissioning Method Statement For Drainage System Instruments & Tools required: Valve operating keys. Measuring Stick Plumbing Toolkit Work Sequence / Commissioning Phases Pre-Commissioning: System Pre-Commissioning Checks Before commissioning the system the following shall be ensured. The Installation and Leak testing of the pipes are completed. The installations sanitary… Read More »

Chlorination Method Statement For Domestic Water Supply Piping System

This Method Statement is to provide guidance in carrying out the water supply system chlorination in accordance with the approved project quality plan, contract specifications and commissioning plan. Purpose of this Method Statement is to control the commissioning activities in line with the Project Quality Plan and Project Commissioning Specification requirements to achieve the optimum… Read More »

Method Statement for Wooden Floor Finishes Installation

Below is the equipment and tools involved in the installation of wooden flooring: Steel tape Table top miter saw Slide compound saw Jig saw Circular saw Battery drill Trimmer Power Plainer Plate Joiner The capacity / size of the above equipment shall be judged in accordance with site conditions, requirements, and availability at the time… Read More »

Termite Control Perfect Method Statement for Anti Termite Treatment

Termite control method statement covers the detailed procedure to be followed for anti termite application under footings, grade slabs, crawl places, around structures, at expansion joints, control joints and the areas where slabs will be penetrated. This procedure shall be read in conjunction with project/contract specification wherever applicable. EQUIPMENT & TOOLS Below is the equipment involved… Read More »