construction project organization chart template

Construction Project Job Descriptions & Organization Chart

On this page you can find typical project organization chart and job descriptions of the project team. The job descriptions include: Project Manager Senior Project Engineer Architectural Coordination Engineer Planning Engineer Quantity Surveyor Safety Officer Quality Control Engineer Structural Engineer Civil Engineer Land Surveyor General Foreman Electrical Engineer Mechanical Engineer Understanding the job description in […]

Construction Project Job Descriptions & Organization Chart Read More »

Civil Engineering Methods, Quality Management, Templates
soft landscaping method statement

Soft landscaping method statement

This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel Crane Personal Protective Equipment: Safety Shoes Safety Helmets Hand Gloves Goggles Method Statement

Soft landscaping method statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
plant and machinery management and maintenance

Plant Machinery Management & Maintenance Procedure

This method is applicable for all  fixed, transportable and mobile machinery and equipment used in the building, construction and earthworks activities of the company. Where plant resource is required on the projects, plant department will be contacted to provide equipment or services. At each project site, project plant coordinator shall ensure that processes are in

Plant Machinery Management & Maintenance Procedure Read More »

Civil Engineering Methods, Quality Management
irrigation-system-piping

Method Statement Irrigation Systems Piping

Only approved material shall be used. Delivered material shall be stored at stores and shall always be subject to client’s representative inspection. Special shaded pipe racks shall be constructed to store pipes. Fittings and irrigation materials shall be stored inside containers that will be kept closed at all times. Transportation: All materials will be transported to

Method Statement Irrigation Systems Piping Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Epoxy Painting Method

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages during the execution of Epoxy Painting Works at project site. The equipment/tools involved in painting works are listed below. Paint Brushes/Roller Paint Sprayers as required

Epoxy Painting Method Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
90-degree-elbow-trimming-formula

90 or 45 Degree Elbow Trimming Calculation & Formula

In Piping design, sometimes you may have to trim the standard elbow into nonstandard trimmed elbow. This will result additional work and cost to the project. Normally Piping Designers will avoid and should avoid this situation. But if it is unavoidable or the designer thinks that to make the orthographic angle it may require more

90 or 45 Degree Elbow Trimming Calculation & Formula Read More »