Below is a precise and comprehensive method statement for water tank installation (GRP Water Tank). The water tank installation shall be carried out by specialist contractor based on the following steps and shall be done in accordance with the approved shop drawings,
Read Complete Method
Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of
Read Complete Method
Below is a precise method statement for fire pump installation, each project will have its own specific method of statement for installation of fire pump. Follow the manufacturer’s instructions while installing the fire pump. Pump shall be stored on a flat surface
Read Complete Method
Containers shall be designed, fabricated, tested and marked (or stamped) in accordance with the Regulations of the U.S. Department of Transportation (DOT), the “Rules for the Construction of unfired Pressure Vessels”, Section VIII, Division 1, ASME Boiler and Pressure Vessel Code, or
Read Complete Method
Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job: Water Spray Nozzle – High
Read Complete Method
Method Statement For The Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution Boards (DB) and Consumer Units(CU) TESTING, COMMISSIONING AND START UP PROCEDURES Upon completion of equipment installation and prior to carrying out test runs, the