Sequence of Operation for Electrical, Low Current & ELV Systems

Below is sequence of operation for different systems which is configured for building management system during testing and commissioning phase of a project. This page will help commissioning engineers to understand how the sequence of operation shall be checked. Fire Alarm Panels Sequence Location: Fire Alarm Panels: Various Locations (refer to Fire Alarm Layout) Each Fire […]

Sequence of Operation for Electrical, Low Current & ELV Systems Read More »

Building Management System, Electrical Method Statements
Possible Cause of Road Crack and Defect - Road Maintenance Inspection Guide

Road Maintenance Standard Requirements During Defect Liability Period

The road maintenance contractor shall be responsible for undertaking all routine maintenance of the existing road and all bridges on the road from the day the road is officially handed-over to the client until the issue of Defects Liability Certificate by the engineer. Contractor shall also carry out all the routine maintenance of the completed

Road Maintenance Standard Requirements During Defect Liability Period Read More »

Roadworks
Best Sanitary Installation Method Statement

Best Sanitary Installation Method Statement

This document describes best method for the sanitary installation to ensure that the installation works are conducted in compliance with the approved design, drawings and material submittals. Prior to the installation of Sanitary Wares, the supervisor and foreman will verify and ensure that all the health and safety requirements are considered and necessary control measures

Best Sanitary Installation Method Statement Read More »

Plumbing Method Statements
Concrete-Formwork-Installation-Method-Statement

Safety Procedure for Erecting and Dismantling Concrete Formwork Systems

This safe work method statement outlines conventional safety requirements for erecting and dismantling the vertical concrete forming systems. However, equipment and forming systems differ for different manufacturers and suppliers. Therefore reference must always be made to the instructions and procedures of the particular manufacturer or supplier whose equipment is being used. Since field conditions vary

Safety Procedure for Erecting and Dismantling Concrete Formwork Systems Read More »

Occupational Health and Safety
Project Construction Methodology

Project Construction Methodology

Construction methodology or project execution methodology refers to the planned method of construction, taking into account all contractual and legal requirements, construction constraints, risks, and opportunities. Project Methodology includes the temporary and permanent works and the services required to complete the construction works. Below is given a detailed methodology for construction of a civil project, which

Project Construction Methodology Read More »

Civil Works Method Statements

Demolition Method Statement for Building Structures or Services

Demolition requires very careful and safe method in order to make sure that persons involved and other related parties are protected from any hazards. Demolition may affect the public, workers and adjacent structures. Therefore a well defined procedure is necessary that will be strictly followed during the demolition work. The following method Statement describes the

Demolition Method Statement for Building Structures or Services Read More »

Civil Works Method Statements, Occupational Health and Safety