Web Master

Ceiling Spray Plaster Works Method Statement

Ceiling Spray Plaster Works Method Statement

Below is precise civil work method statement that details general procedure to be followed for ceiling spray plaster works at any kind and size of project. The procedure includes preparatory works & method of ceiling spray application. Arrange below tools and equipment before starting the ceiling spray paint and spray plaster activities: Wire brush Skimmer […]

Ceiling Spray Plaster Works Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements, Occupational Health and Safety

Water Chiller Installation Method Statement

Below is a standard method statement or procedure which can be used for installation of water chiller on its foundation after it is delivered on the sites. Before starting the activity of chiller installation following tools/equipment shall be arranged: Tool Box Lifting Equipment (Cranes) Electric Drill Machine Ladders Threading Machine Welding/ Brazing Machine (if required)

Water Chiller Installation Method Statement Read More »

HVAC Method Statements, Method Statements
Installation method statement for Curtain Wall

Installation of Glazed Aluminum Curtain Wall & Composite Cladding

You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be obtained and site dimensions shall be verified before start of any activities on

Installation of Glazed Aluminum Curtain Wall & Composite Cladding Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Method Statement for Hydrostatic Testing of Metallic Pipework

The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at the project and to be followed for all piping works at site. Prior

Method Statement for Hydrostatic Testing of Metallic Pipework Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements, Pressure Testing, Testing & Commissioning
Hot Water Calorifier Testing and Commissioning Method Statement

Hot Water Calorifier Testing and Commissioning Method Statement

This method statement is applicable for the testing and commissioning of hot water calorifier or water heater for any kind of building or projects. Arrange below tools before start of the work: Electrical Toolbox Box spanner set Pipe wrench Pre Commissioning Requirements Before commencing the testing and commissioning of calorifier the following shall be carried

Hot Water Calorifier Testing and Commissioning Method Statement Read More »

Method Statements, Plumbing Method Statements, Testing & Commissioning
Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method of Statement

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement

This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible for overall management including quality and HSE requirements of all construction activities at

Underground Coated Carbon Steel Piping Excavation, Installation, Jointing and Backfilling Method Statement Read More »

HVAC Method Statements, Method Statements, Piping Method Statements, Piping Works, Pressure Testing, Stainless Steel Fabrication
Safety Instructions for the use of Compressed Air Tools and Units

Safety Instructions for the use of Compressed Air Tools and Units

The purpose of this safety procedure is to provide instruction and direction as to what the correct usage of compressed air tools and equipment should be to minimize the risk of injury to personnel and assets. Below procedure is applicable for all kind and size of projects, but additional control measures may be required depending

Safety Instructions for the use of Compressed Air Tools and Units Read More »

Civil Engineering Methods, Occupational Health and Safety, Risk Assessment
Method Statement For Installation Of Automatic Aluminium Sliding Door

Aluminum Sliding Doors Installation Method of Statement

Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. Ensure that shop drawings is complete and method of aluminium door fixation, details of aluminium units is approved

Aluminum Sliding Doors Installation Method of Statement Read More »

Aluminium & Glass Work Methods, Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
error: Content is protected !!
Scroll to Top