cost-of-quality-estimation-formula

Cost Of Quality Estimation & Reporting Procedure

Cost of quality is one aspect of any process or project that is always under estimated. The cost of poor quality sometimes puts a company at the risk of bankruptcy. This critical situation can come due to uncontrolled losses associated with cost of rework and cost of rejected products and or materials. Quality professionals must […]

Cost Of Quality Estimation & Reporting Procedure Read More »

Quality & Project Management, Technical Articles

QHSE Meaning and Evolution of Quality, Health, Safety and Environmental Management Systems

QHSE is the term famous for the two professions collectively and in fact for four areas or roles i.e. Quality, Health, Safety and Environment or environmental. In some industries the security is also part of QHSE where it is abbreviated as QHSSE. In addition you may observe the terms HSEQ, QSHE, SHEQ which in fact

QHSE Meaning and Evolution of Quality, Health, Safety and Environmental Management Systems Read More »

Occupational Health and Safety, Quality & Project Management, Technical Articles
Construction-Contract-Review-Procedure

Project Construction Contract Review Procedure

1. Purpose The purpose of this project management procedure is to ensure that prior to submitting a Tender the proposed terms and conditions are appropriately reviewed in order to: – gain an overall appreciation of the risk profile of the proposed contract – identify any specific provisions which may be unacceptable to COMPANY and that will require

Project Construction Contract Review Procedure Read More »

Quality & Project Management

Method Statement For Spool Fabrication Of Steel Piping

The spool fabrication will be implemented with the sequence of marking, cutting, fit-up, welding, and painting. Marking All materials shall be marked for identification and traceability with respect to installation area, sheet number and spool number. The cut pipe spools shall be marked with their respective spool numbers, in accordance with the marked up fabrication

Method Statement For Spool Fabrication Of Steel Piping Read More »

Steel Structure & Fabrication
BMS System Control devices

Electrical & Mechanical BMS Control Devices

Chilled Water Automatic control valves 2″ and smaller shall be screwed type, of red brass material and valves 2½” and larger shall be cast iron type and flanged. Valves shall be ANSI- rated to withstand the pressures and temperatures encountered. Valves shall have stainless-steel stems and spring loaded Teflon packaging with replaceable discs. All valves

Electrical & Mechanical BMS Control Devices Read More »

Building Management System

BMS Energy Management Software Control Functions

Generally any energy management control software shall provide as a minimum the following functions. Each function is detailed separately. Time Control Modes There shall be no limit to the number of time schedules each of which can have any point or number of points assigned. Each time programme shall operate over a seven-day week and allow

BMS Energy Management Software Control Functions Read More »

Building Management System

BMS Alarms Reporting and Functions

The BMS provides a vehicle for the visibility of plant failure, patterns, annunciation of alarms and the reporting function. In particular it shall provide the standard functions stated below: Alarms shall be generated under the following conditions: Digital input contact change from normal to alarm condition (either open or closed). Digital input condition either matches

BMS Alarms Reporting and Functions Read More »

Building Management System
error: Content is protected !!
Scroll to Top