The purpose of this Method Statement is to establish the procedures, responsibilities, safety requirements, quality control measures, inspection criteria, and installation methodology for Laboratory Plume Fans and associated equipment.
The objective is to ensure that laboratory plume fans are installed safely, accurately, and in accordance with approved shop drawings, project specifications, manufacturer recommendations, and applicable international standards to provide effective dilution and discharge of hazardous laboratory exhaust contaminants while maintaining system reliability, laboratory containment integrity, and environmental compliance.
Download Method Statement For Installation Of Laboratory Plume Fans & Energy Recovery Coil Integrated System.
The Download Package Contains:
- Method Statement
- Checklists for Installation
- Inspection & Testing Plan
- Risk Assessment
The files are in Word/Excel formats and instantly available after the payment.
You only need to change project name, insert logos and the document shall be ready for submission and approval from consultant/clients.

Download Method Statement with Checklists, ITP & Risk Assessment
Discover more from Method Statement HQ
Subscribe to get the latest posts sent to your email.


