Lead Acid Batteries Installation Operating Maintenance Instructions

Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and preferably cool and frost-free location. Do not expose the cells to direct sunlight as damage to the container and cover may occur. As the batteries are supplied charged, storage time is limited. In […]

Lead Acid Batteries Installation Operating Maintenance Instructions Read More »

Construction Method Statements, Electrical Method Statements, Method Statements, Testing & Commissioning

Method Statement for Water Tank Installation – GRP Water Tank

Below is a precise and comprehensive method statement for water tank installation (GRP Water Tank). The water tank installation shall be carried out by specialist contractor based on the following steps and shall be done in accordance with the approved shop drawings, specifications and approved material submittal. Installation contractor shall properly coordinate with the civil

Method Statement for Water Tank Installation – GRP Water Tank Read More »

Method Statements, Plumbing Method Statements
uPVC Pressure piping system

uPVC High Pressure Water Supply Piping System Installation Procedure

Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of shop drawings, technical submittals, inspection and test plans are in the work place

uPVC High Pressure Water Supply Piping System Installation Procedure Read More »

Method Statements, Plumbing Method Statements, Pressure Testing

Fire Pump Installation Method Statement

Below is a precise method statement for fire pump installation, each project will have its own specific method of statement for installation of fire pump. Follow the manufacturer’s instructions while installing the fire pump. Pump shall be stored on a flat surface in well-ventilated storage area. Inlet and outlet flange blanks shall not be removed

Fire Pump Installation Method Statement Read More »

Construction Method Statements, Method Statements, Plumbing Method Statements
water spray system installation method statement

Water Spray Firefighting System Installation Method Statement

Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job: Water Spray Nozzle – High Velocity Deluge Valve, OS & Y Valve Electrical Devices Pipe Wrenches Hammer Chisel

Water Spray Firefighting System Installation Method Statement Read More »

Construction Method Statements, Method Statements, Plumbing Method Statements
distribution board testing procedure

Main Sub-Main Distribution Boards Testing and Commissioning Procedure

Method Statement For The Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution Boards (DB) and Consumer Units(CU) TESTING, COMMISSIONING AND START UP PROCEDURES Upon completion of equipment installation and prior to carrying out test runs, the Contractor shall visually inspect the installation and satisfy that the equipment has been

Main Sub-Main Distribution Boards Testing and Commissioning Procedure Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
main-distribution-board MDB Testing Procedure

Main Distribution Board MDB Testing & Commissioning Procedure

Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded in prescribed format. There are 3 cases to be considered. Case 1 is

Main Distribution Board MDB Testing & Commissioning Procedure Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves

These instructions relate only to Crane Gem rubber lined Butterfly valves, which are designed and manufactured to provide isolation, or can be used for regulation, of flow of suitable fluids. Valves must be installed into a well-designed system and it is recommended that the system be inspected in accordance with the appropriate member state legislation.

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves Read More »