Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

excavation-requirements

Method Statement for Ground Preparation of Excavations & Service Trenches

This document covers excavation and ground preparation for the roadway and service trenches and shall include all excavation, shaping and sloping necessary for the construction, preparation and completion of all subgrade, shoulders, slopes, gutters, intersections, approaches, entrances and trenches in conformity to the alignment, grades, and cross-sections shown on the drawings or established by the […]

Method Statement for Ground Preparation of Excavations & Service Trenches Read More »

Civil Engineering Methods, Method Statement for Civil Works

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams

Prior transferring materials from lay down, the foreman shall make a materials inventory at the lay down area as per approved shop drawings if the all materials required for the passenger’s elevator hooks, hook beams and divider beams are all available at site. If found the materials available at site, the foreman shall take permission

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Installation-of-Steel-Structure-method-statement

Procedure for Installation of Steel Structure for Pump Rooms

The following Method Statement describes the procedure and equipment required for the installation of steel structure for pump room. Following equipment shall be arranged: Lifting Equipment: Tower Crane (if available) To lift the beams/Purlins structure from ground floor to the roof where  the area of installation is located. JCB or Fork Lift To bring the beams

Procedure for Installation of Steel Structure for Pump Rooms Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements

Ring Main Unit Testing and Commissioning Method Statement

In a ring main unit distribution system feeder covers the whole area of supply in the ring fashion and finally terminates at the substation from where it is started. The unit forms a closed loop and looks like a ring. The advantages of RMU is that less conductor material is required as each part of

Ring Main Unit Testing and Commissioning Method Statement Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

UV Sterilization System Testing and Commissioning Method Statement

Ultraviolet UV Sterilization System are useful in many water purification systems to disinfect and control bacteria. Ultraviolet or UV energy is found in the electromagnetic spectrum between visible light and x-rays and can best be described as invisible radiation. UV light occurs with a wavelength ranging from 200 to 390 nanometers (nm). The most effective

UV Sterilization System Testing and Commissioning Method Statement Read More »

Method Statements, Plumbing Method Statements, Testing & Commissioning

Pre Action System Testing and Commissioning Method Statement

Following tools shall be arranged before starting the testing and commissioning of pre action system. Valve opening keys Screw drivers Smoke agent Digital multi meter Communication Devices Pre-Commissioning Checks Before commissioning the system the following shall be ensured: The system has been checked against the approved installation drawings. The pressure testing or the pipes arc

Pre Action System Testing and Commissioning Method Statement Read More »

Method Statements
Diesel-Generator-Genset Mobilization Method

Method Statement for Mobilization of Diesel Generator Genset

Step 1: Electrical Circuit Isolation Isolate the main electrical connections and supply line from the gen-set. Cut off the main circuit breaker of the generator control panel to “stop”. Disconnect the electrical batteries connection from the genset. Disconnect the grounding cable from the battery. Step 2: Dismantling of Radiator Exhaust Ducts Mark the mating parts

Method Statement for Mobilization of Diesel Generator Genset Read More »

Electrical Method Statements
Filling-Core-Sonic-Pipes

Procedure for Filling Core Sonic Pipes

The following describes the procedure for filling core sonic pipes with cement grout. Prepare the mix as per the proposed mix design given below using following equipment’s: Mixer Piston Pump Grout hose of suitable length Grout Mix Design For Filling Core Sonic Pipes For Grout Strength 30N/mm2 Mix  Design OD Weights MSRC (Type II) 1420 kg/m3

Procedure for Filling Core Sonic Pipes Read More »

Civil Engineering Methods, Method Statement for Civil Works