Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

MV Switchgear Installation Method Statement

This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to ensure that all MV/LV switchgear and panels site assembly, installation, final connection and workmanship is correct and acceptable and conforms to the contract documents & electrical specifications. The Project Manager is […]

MV Switchgear Installation Method Statement Read More »

Electrical Method Statements, Method Statements
Driven Piles Installation Method Statement

Driven Piles Installation Method Statement

The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works. Piling contractor shall maintain and provide all the record for each pile driven. Handling and Storage of Piles The piling contractor shall ensure that all piles are stacked correctly with timber being placed

Driven Piles Installation Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Best Sanitary Installation Method Statement

Best Sanitary Installation Method Statement

This document describes best method for the sanitary installation to ensure that the installation works are conducted in compliance with the approved design, drawings and material submittals. Prior to the installation of Sanitary Wares, the supervisor and foreman will verify and ensure that all the health and safety requirements are considered and necessary control measures

Best Sanitary Installation Method Statement Read More »

Method Statements, Plumbing Method Statements

Piping Installation, Welding & Fabrication Method Statement

TABLE OF CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESOURCES RESPONSIBILITIES SEQUNCE OF WORKS QA/QC REQUIREMENTS HSE REQUIMENTS EMERANCY CONTACTS Purpose: The purpose of this methodology is to provide a systematic control and direction for the activity for the installation of piping at a construction site. This method statement provides the expectation to execute work in safe,

Piping Installation, Welding & Fabrication Method Statement Read More »

HVAC Method Statements, Stainless Steel Fabrication
standby diesel generator installation instruction

Generator Installation Method Statement Including Fuel Tank Installation at High Level

This method statement covers the generator and fuel tank installation for any kind of project. Prior to commencement of the works, all activities shall be coordinated with Project Safety Officer and PTW holder, who will assess the associated risks, and monitor the implementation of the work as per the Project Safety Plan and liaise with

Generator Installation Method Statement Including Fuel Tank Installation at High Level Read More »

Electrical Method Statements, Method Statements
Mass (Ribbon) Fusion Splicing

Termination of Fiber Optic Cables

This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and door junction box but can be applicable for any kind of network installations. Roles and Responsibilities: The electrical manager shall be responsible for the overall implementation of this method statement, and to ensure that

Termination of Fiber Optic Cables Read More »

Building Management System, Electrical Method Statements
Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

This macadam work method statement covers laying and compacting clean, crushed, graded aggregate and granular materials premixed with water into a dense mass on a prepared Granular Sub base Course to specified lines, grades and cross sections as shown in drawings, subject to a minimum thickness of 75 mm and max. of 200 mm. References

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base Read More »

Civil Engineering Methods, Method Statements, Roadworks