Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

termite control and anti termite treatment procedure

Method Statement for Anti Termite Treatment

Below is a standard method statement for anti termite treatment. Termite control method statement covers the detailed procedure to be followed for anti termite application under footings, grade slabs, crawl places, around structures, at expansion joints, control joints and the areas where slabs will be penetrated. This procedure shall be read in conjunction with project/contract […]

Method Statement for Anti Termite Treatment Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements

Download Method Statement For Installation & Testing of Drainage Piping

Download Method Statement For Drainage Piping INSTALLATION & TESTING Now you can Download Method Statement, ITP, Installation Checklist, Leak Test Sheet and Risk Assessment For Drainage Piping Installation by paying a very nominal fees of $2.99. The files are in word/excel format and instantly available after you pay the cost of only 2.99$. You only need to change

Download Method Statement For Installation & Testing of Drainage Piping Read More »

Plumbing Method Statements, Testing & Commissioning

Download Method Statement For Refrigerant Piping Installation & Pressure Testing

Download Method Statement For INSTALLATION & TESTING OF REFRIGERANT PIPING SYSTEM FOR FCU, PACKAGED UNITS CCU ETC. Now you can Download Method Statement, ITP, Installation & Pressure Test Checklists and Risk Assessment For Refrigerant Piping Installation & Pressure Testing.   The files are in word/excel format and instantly available after you pay the cost of only 2.95$. You only

Download Method Statement For Refrigerant Piping Installation & Pressure Testing Read More »

HVAC Method Statements

Download Method Statement For Testing & Commissioning of Audio Visual System AVS

Download Method Statement For Testing & Commissioning of  Audio Visual System AVS  Download package contains the Method Statement + Checklist for Pre-Commissioning + Checklist for Testing & Commissioning + Inspection & Testing Plan + Quality Control Procedure QCP +  Risk Assessment   You only need to change project name and insert logos etc and the same shall be ready to

Download Method Statement For Testing & Commissioning of Audio Visual System AVS Read More »

Electrical Method Statements, Testing & Commissioning

Download Method Statement For Installation of Sleeves & Puddle Flanges

Download Method Statement For Installation of  Sleeves & Puddle Flanges  Download package contains the Method Statement + Checklist Installation + Inspection & Testing Plan +  Risk Assessment   You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files

Download Method Statement For Installation of Sleeves & Puddle Flanges Read More »

Plumbing Method Statements

Download Method Statement for Disabled Toilet Alarm System DTA Testing & Commissioning

Download Method Statement for Disabled Toilet Alarm System DTA Testing & Commissioning   Download package contains the Method Statement + Checklists for Pre Commissioning + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval

Download Method Statement for Disabled Toilet Alarm System DTA Testing & Commissioning Read More »

Electrical Method Statements, Testing & Commissioning

Download Method Statement for Installation of Enclosed switches Isolators

Download Method Statement for Installation of Enclosed switches Isolators  Download package contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files

Download Method Statement for Installation of Enclosed switches Isolators Read More »

Electrical Method Statements

Refrigerant Piping Installation and Pressure Testing Method of Statement

Below is the detailed procedure for the installation of refrigerant piping which can be applicable for any kind of air conditioning works or ac copper pipe. Below is list of necessary tool requirements for installation and testing of refrigerant piping works. Mechanical Tool Box Sandpaper or Sand cloth Wire brush Testing Tools Nitrogen cylinder Soldering

Refrigerant Piping Installation and Pressure Testing Method of Statement Read More »