Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams

Prior transferring materials from lay down, the foreman shall make a materials inventory at the lay down area as per approved shop drawings if the all materials required for the passenger’s elevator hooks, hook beams and divider beams are all available at site. If found the materials available at site, the foreman shall take permission […]

Installation Of Passenger’s Elevator Hooks, Hook Beams & Divider Beams Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Installation-of-Steel-Structure-method-statement

Procedure for Installation of Steel Structure for Pump Rooms

The following Method Statement describes the procedure and equipment required for the installation of steel structure for pump room. Following equipment shall be arranged: Lifting Equipment: Tower Crane (if available) To lift the beams/Purlins structure from ground floor to the roof where  the area of installation is located. JCB or Fork Lift To bring the beams

Procedure for Installation of Steel Structure for Pump Rooms Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements

Ring Main Unit Testing and Commissioning Method Statement

In a ring main unit distribution system feeder covers the whole area of supply in the ring fashion and finally terminates at the substation from where it is started. The unit forms a closed loop and looks like a ring. The advantages of RMU is that less conductor material is required as each part of

Ring Main Unit Testing and Commissioning Method Statement Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

UV Sterilization System Testing and Commissioning Method Statement

Ultraviolet UV Sterilization System are useful in many water purification systems to disinfect and control bacteria. Ultraviolet or UV energy is found in the electromagnetic spectrum between visible light and x-rays and can best be described as invisible radiation. UV light occurs with a wavelength ranging from 200 to 390 nanometers (nm). The most effective

UV Sterilization System Testing and Commissioning Method Statement Read More »

Method Statements, Plumbing Method Statements, Testing & Commissioning
Diesel-Generator-Genset Mobilization Method

Method Statement for Mobilization of Diesel Generator Genset

Step 1: Electrical Circuit Isolation Isolate the main electrical connections and supply line from the gen-set. Cut off the main circuit breaker of the generator control panel to “stop”. Disconnect the electrical batteries connection from the genset. Disconnect the grounding cable from the battery. Step 2: Dismantling of Radiator Exhaust Ducts Mark the mating parts

Method Statement for Mobilization of Diesel Generator Genset Read More »

Electrical Method Statements
Temporary-Retaining-Wall-Installation-Method-Statement

Method Statement for Temporary Retaining Wall Installation

The existing ground level varies between + 3.52 m DMD to + 4.29 m DMD. The working platform level for Double U wall is considered at the average ground level. A Double U channel beam wall with one layer of tie-back anchors shoring system is proposed along the four sides of the plot for a

Method Statement for Temporary Retaining Wall Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works

Method Statement for Piling Works Constructions – Drilling

Below is a brief method statement of piling work that can be used for any kind of project piling works. A crawler mounted piling rig will be used to install bored cast in situ piles of dia 1200 mm. The procedure for the construction of bored piles, with temporary casing under bentonite / water  support

Method Statement for Piling Works Constructions – Drilling Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Pan Tilt & Zoom or PTZ CCTV Camera

CCTV Camera Testing & Commissioning Procedure

The purpose of this method statement is to specify the detailed requirements and procedure for testing & commissioning of installed CCTV System at a project in accordance to the specification and manufacture’s recommendation to reach the required quality and satisfying the requirements of the client. Below is the list of equipment that shall be used

CCTV Camera Testing & Commissioning Procedure Read More »

Construction Method Statements, Electrical Method Statements, Method Statements, Testing & Commissioning