Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Method Statement for Insulation & Cladding of CHW Chilled Water Pipe

A precise chilled water pipe insulation procedure is given below: Check all required approved chilled water pipe insulation materials are readily available on site. Install the pipe insulation according to this method statement, taking into consideration the manufacturer instructions as per material submittal. Ensure all insulation materials are in dry condition at all times, especially […]

Method Statement for Insulation & Cladding of CHW Chilled Water Pipe Read More »

HVAC Method Statements

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE

TESTING OF CHILLED WATER PIPES & FITTINGS Care will be taken to avoid all the equipment, apparatus, devices to a pressure exceeding its prescribed test pressure as obtained from its name plate data or product catalogs. All equipment, apparatus and devices that might be damaged by the test pressure shall be isolated, removed, bypassed or

TESTING OF CHILLED WATER PIPES & FITTINGS – HOW TO GUIDE Read More »

HVAC Method Statements, Method Statements, Pressure Testing, Testing & Commissioning
Disinfection and Flushing of Water Mains

Disinfection and Flushing of Water Mains

Purpose of this plumbing method statement is to ensure that disinfection and flushing of water mains and related pipe lines are executed safely and in accordance with the contract requirements and that all quality assurance / control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented for the

Disinfection and Flushing of Water Mains Read More »

Plumbing Method Statements, Testing & Commissioning
HVAC Method Statement for Grill Diffuser and Louver Installation

HVAC Method Statement for Grill Diffuser and Louver Installation

This hvac method statement covers the supply & installation of grilles, diffusers louvers & disc valves in line with project requirements as indicated in the approved shop drawings, reflected ceiling plans, specifications and manufacturer’s instructions. Plant and equipment required General tool box including screwdrivers Electric drill with appropriate bits Spirit level, water level Measurement tape

HVAC Method Statement for Grill Diffuser and Louver Installation Read More »

Duct Works, HVAC Method Statements
Earthworks Method Statement

Earthworks Method Statement

This method statement for earthworks defines requirements for civil work related activities, but it doesn’t cover the earthwork activities related to underground piping, conduits and ducts which are covered under different earthworks method statements. All the earthworks shall be done in accordance with applicable standards, specifications, regulations and Client’s reference documents for the project. Terms

Earthworks Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Micro Pile Installation and Pile Test Method of Statement

Micro Pile Installation and Pile Test Method of Statement

Scope of this work method statement shall apply on the reinforced concrete works and the objective is to define and establish the work method of statement for the reinforced concrete work for the installation of micro pile. The piling installation work shall be done in compliance with construction drawings and contract specifications. Following personnel are

Micro Pile Installation and Pile Test Method of Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Water Booster Pump Installation Testing and Commissioning Method Statement

Water Booster Pump Installation Testing and Commissioning Method Statement

Below is a precise method of statement for water pump or booster pump installation including the testing and commissioning steps. Make sure that proper clearance is available from civil side before commencement of water pump installation works. Ensure that the work area is clean and safe for carrying out the activities. Also prior to start

Water Booster Pump Installation Testing and Commissioning Method Statement Read More »

Method Statements, Plumbing Method Statements, Testing & Commissioning
Heat Exchanger Installation Testing and Commissioning Method Statement

Heat Exchanger Installation Testing and Commissioning Method Statement

Unless otherwise specified, all plate heat exchanger installation shall be in accordance to approved shop drawings, manufacturer instructions and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Heat Exchanger’s. Install Plate Heat  Exchanger’s as indicated unless deviations to layout are approved on coordination drawings. Plate Heat Exchanger shall be installed

Heat Exchanger Installation Testing and Commissioning Method Statement Read More »