Construction Method Statements

Construction method statements are basic documents that a site engineer needs when he starts the construction works.
Our website provides hundreds of construction method statements related to civil, electrical, mechanical, plumbing, HVAC and firefighting disciplines.
We recommend you to visit our construction method statement online portal where you can search different documents as per your needs.

Scaffolding Method Statement

Scaffolding Method Statement

Below is a precise method statement for scaffolding installation for any kind of project. The following method statement is written to provide a safe and efficient system of work for the installation of general working scaffold to all areas of construction sites within the project. It will also cover all scaffold adaption’s to general scaffold […]

Scaffolding Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements, Occupational Health and Safety
Chilled Water Dosing System Dosing Pot Installation and Testing Method Statement

Chilled Water Dosing System Dosing Pot Installation and Testing Method Statement

The purpose of this method statement is to define the steps to implement the correct practices for the installation of chemical dosing system (pot) for chilled water piping. By following this procedure contractor shall ensure that the performance of the chemical dozing system and equipment complies with the project requirements and serves the intended function

Chilled Water Dosing System Dosing Pot Installation and Testing Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning

Laboratory Gas Piping System Testing & Commissioning Method

This method statement covers all processes related to Testing & Commissioning of Laboratory Gas System, procedure is to be read in conjunction with the relevant ITP, outlining the responsibility and the quality verification to be performed by various parties. Project manager is overall responsible to make sure that all installations and testing activities are done

Laboratory Gas Piping System Testing & Commissioning Method Read More »

Method Statements, Piping Method Statements, Testing & Commissioning
Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement

This method statement is applicable for the Testing & Commissioning of Fan Coil Units for the project as mentioned in the project specifications & approved shop drawings. Before commencement of FCU testing & commissioning activity, the supervisor must ensure that pre-commissioning of the FCU is complete and approved. Also make sure that all Installations &

Fan Coil Unit FCU Testing Pre-commissioning & Commissioning Method Statement Read More »

Construction Method Statements, HVAC Method Statements, Method Statements, Testing & Commissioning

Control Valve & Actuator Installation Method Statement for HVAC System

The purpose of below instrument installation method statement is to set out a clear and defined method of ensuring that the correct control valve is selected and installed in the correct position in the HVAC system. In addition a method is also set out which will ensure that the correct actuators for each specific control

Control Valve & Actuator Installation Method Statement for HVAC System Read More »

HVAC Method Statements, Method Statements
split unit ac testing and commissioning

Split Unit Testing and Commissioning Method Statement

Below is a precise HVAC method statement that briefly explains testing and commissioning of split unit ac air conditioner. The test will be commenced after Split Unit installation and power supply panel T&C activities completed. All areas and fan inlet & outlet should be cleared of waste materials and any other obstruction. The purpose of

Split Unit Testing and Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
installation-of-Industrial-Exhaust-Fans

Exhaust Fan Installation Procedure ( Axial, Centrifugal and Propeller Exhaust Fans)

Below is a precise exhaust fan installation procedure that covers installation of Axial, Centrifugal and Propeller types of exhaust fans. This standing procedure step wise defines the method that will help to ensure that installation of axial / centrifugal / propeller fan’s, supports, vibration isolators and final connections is done as per project specifications. Also

Exhaust Fan Installation Procedure ( Axial, Centrifugal and Propeller Exhaust Fans) Read More »

Duct Works, HVAC Method Statements