The purpose of this hydrostatic testing procedure is to list out various steps involved in hydrostatic pressure testing, pigging, draining, swabbing and drying of pipelines for any kind and size of pipeline project in line with the project specifications and applicable standards
Read Complete Method
There are many different welding processes, but the most commonly used in the construction industry are gas welding and electric arc welding. In order to ensure that all welding works takes place in a safe manner, the suitability of the following should
Read Complete Method
Below is a precise and best method of statement that is applicable for installation, testing & commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The scope of works includes the delivery to site,
Read Complete Method
Below is a standard method statement or procedure which can be used for installation of water chiller on its foundation after it is delivered on the sites. Before starting the activity of chiller installation following tools/equipment shall be arranged: Tool Box Lifting
Read Complete Method
This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible
Read Complete Method
Below is a precise hvac method statement that covers the CHW chilled water pump Installation Alignment and Balancing works applicable for any kind of mechanical project. Before start of work examine areas, equipment foundations, and conditions for compliance with requirements for installation
Read Complete Method