HVAC Method Statements

Method statement for building construction is very important for successful completion of the construction projects. HVAC is a major discipline of any project and MEP engineers are using method statements for air conditioning works. Method statements include the ducting works, sleeves, chilled water piping, pipe welding, flushing of pipes and installation of HVAC equipment’s. In addition to installation method statements the requirements is also for testing and commissioning method statements. As part of method statement there are always, risk assessments, inspection and test plans ITP and inspection checklists.

Below you can browse our collection of method statement for HVAC building construction works free of cost. If you are looking for editable files in Word format that you can also use for submission then you may need to visit our method statement download center.
HVAC Building Construction Method Statements

Chilled Water Pump Testing & Commissioning Method Statement

Below is a precise testing and commissioning method statement for chilled water pumps on a project site. The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of CHW chilled water pumps. By following the guidelines […]

Chilled Water Pump Testing & Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning

Nitrogen Flushing of Air Conditioning and Refrigeration Systems

Below is the standard procedure for the proper flushing of air-conditioning and refrigeration system with the use of dry nitrogen, and refrigeration equipment which require flushing of the system after exposing it to the atmosphere or during replacement of the refrigerant compressor. Responsibilities:  It is the responsibility of the A/C technician to conduct flushing of the

Nitrogen Flushing of Air Conditioning and Refrigeration Systems Read More »

HVAC Method Statements, Method Statements
Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of chilled water pressurization unit through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to the satisfactory level of

Chilled Water Pressurization Unit Testing & Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
Copper Piping Method Of Statement For Installation

Copper Pipe Joint Method Statement | Flaring & Swaging

The purpose of this method statement is to establish a standard procedure for the proper cutting and jointing of copper pipe by using the right tools and procedure i.e. flaring or swaging joints. Below method will also serve as guideline for newly hired employee which will be dealing with air conditioning unit maintenance activity or

Copper Pipe Joint Method Statement | Flaring & Swaging Read More »

HVAC Method Statements, Method Statements, Piping Method Statements

Method Statement for Fire Fighting System Installation Testing & Flushing

The purpose of this method statement for fire fighting system installation is to ensure that correct materials & equipment are used and agreed procedures are implemented during fabrication, installation, testing and flushing of firefighting piping sprinkler system. This method statement specifies the sequence and construction methodology to be followed for the installation and testing of firefighting piping,

Method Statement for Fire Fighting System Installation Testing & Flushing Read More »

Construction Method Statements, Method Statements, Piping Works, Plumbing Method Statements

Installation & Leakage Testing Method Statement of Drainage Piping

This page provides a precise method statement for drainage pipe installation which is useful for any kind of project. Below is list of plant & equipment used for the drainage piping installation work: Measuring tape Tool Box Measuring Tape Hack Saw Spirit Level Excavator. Roller/Plate Compactor HDPE Butt Weld/Electro Fusion Weld Machine During transportation pipes

Installation & Leakage Testing Method Statement of Drainage Piping Read More »

Method Statements, Piping Method Statements, Piping Works, Plumbing Method Statements
method statement for copper pipe installation and brazing

Copper Pipe Brazing | Copper Pipe Joints | Method Statement

On this page you shall find a brief method statement for copper pipe joints installation and brazing for any kind of project. Below is list of mandatory tools and equipment’s that are useful for this activity. Tool box for Mechanical/Hand Tools Leveling Instrument Silver Brazing Rods Blow-Torch or Heating Torch Thermometer (Heating gauge indicator if

Copper Pipe Brazing | Copper Pipe Joints | Method Statement Read More »