Category Archives: Method Statement for Civil Works

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Road Markings & Markers Method Statement

Below is a brief method statement for road markings and road signs. The method will ensure the quality of work in accordance with the contract requirements and applicable local standards. Following this road work method statement will also ensure that all quality assurance/ control activities are happening in a systematic manner. Arrange following materials and… Read More »

Method Statement for Bituseal Enamel application

The Bituseal Enamel is based on a specially selected bitumen, modified with high performance engineering polymers. This polymer modification ensures improvements of a number of the product’s qualities, e.g. flexibility, adhesion and durability. Bituseal Enamel is supplied in different types/grades, depending on the varying requirements for corrosion protection materials for pipelines. The key factor in… Read More »

Method Statement for Surveying Work

The purpose of this procedure is to follow proper activities of survey works for setting of grid lines & recording of existing ground level to carry out excavation and other works in all buildings in the project as per the technical specification and standards. It includes survey works for setting of grid lines & recording… Read More »

Method Statement for Bulk Earthworks

This Method Statement describes the works operation to undertake mass earthworks and sub grade construction that comply with the specified requirements for construction of new or widening of existing road under normal circumstances. The works covers all work in connection with the construction of cuts and fills including, Clearing and Grubbing, the removal to spoil… Read More »

Method Statement for Site Clearance Grubbing and Topsoil Removal

The purpose of this procedure is to outline the Site clearance, Grubbing and Topsoil removal. The detailed guide will provide the clear steps undertaken to complete the process of the site clearance activities in a safe, systematic and efficient manner in compliance to the statutory and environmental requirements. The procedure will include the removal and disposal of… Read More »

Soft landscaping method statement

This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel Crane Personal Protective Equipment: Safety Shoes Safety Helmets Hand Gloves Goggles Method Statement… Read More »