Method Of Statement For Structural Excavation & Backfilling

Excavation and Backfilling for Culverts, Storm Sewers and Ducts Precast concrete and steel pipe culverts and pipe ducts will be installed in trenches cut into previously constructed and compacted embankment either from the subgrade or from an embankment height at least twice

2018
Oct
18

Method Statement for Earthwork Related to Track Work

Before start of work, following equipment and machinery shall be arranged for earthwork and monitoring. Excavators Dump Trucks Bull Dozers Compactor Rollers Settlement Gauges/Settlement Markers Survey Equipment To begin with, licensed surveyor is required to establish the boundary and the temporary bench

2018
Oct
12

Construction Project Site Mobilization Method Statement

Construction site mobilization

Project starts from project mobilization. Once you win the project and client asks you to move your team you need certain documents for submission and approval. Site mobilization method statement is one of such requirement. Now a days most of the government

2018
Sep
4

Installation of Glazed Aluminum Curtain Wall & Composite Cladding

Installation method statement for Curtain Wall

You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be

2018
Sep
1

Concrete Reinforcement Standard Requirements and Specifications

Reinforcement-Bars-requirement-sizes-and-weight

All reinforcement for use in the permanent works shall be specified on the drawings and shall comply with the Standards specified below. Deformed bars shall have Type 2 bond classification. BS or American Standards are applicable as mentioned but not limited to the

2018
Aug
31

Loading Platform Erection, Assembling and Installation Method Statement

Loading-Platform-Construction-Method-Statement

The Scope of this method statement covers all operations and associated activities involved in safe and efficient erection and construction of Loading Platforms including assembling and installation for efficient and effective utilization of Platforms in execution of project works. Following tools /

2018
Aug
19

Method Statement For Installation & Erection Of Building Hoist

Method statement for installation of hoist for construction of building

Hoist is a Rack and Pinion lift that is useful on construction site for transportation of personnel and materials. It is installed and dismounted conveniently and can grow as high as the building grows in height. Hoist has reliable electrical and mechanical

2018
Aug
17

Method Statement for Cementitious and Reactive Waterproofing Works

method statement for Cementitious Water proofing

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities for Cementitious and Reactive Waterproofing for Floor and Walls of