Civil Works Method Statements

Method statement for civil works is very important for the building construction works.

These documents are used for approval of the civil construction works.

In order to start a construction activity method statement for building construction should be prepared and submitted for approval.

Click here to download complete set of civil work method statements.

Below is the list of method statements for civil works that you can check by scrolling down and then visiting other pages as well.

You can search a specific civil method statement from search box on right side of this page.

Method Statement For Screeding Topping Above & Below Tiling In Toilet Roof or Raft Slab

Floor Screeding Work Method Statement for Screeding / Topping Above & Below Tiling In Toilet Roof or Raft Slab

This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. Method statement also covers the Screeding operation below tiling works in concrete slabs wherever necessary. This floor Screeding procedure shall be read in conjunction with contract civil specifications as applicable. The purpose […]

Floor Screeding Work Method Statement for Screeding / Topping Above & Below Tiling In Toilet Roof or Raft Slab Read More »

Civil Works Method Statements
Loading-Platform-Construction-Method-Statement

Loading Platform Erection, Assembling and Installation Method Statement

The Scope of this method statement covers all operations and associated activities involved in safe and efficient erection and construction of Loading Platforms including assembling and installation for efficient and effective utilization of Platforms in execution of project works. Following tools / equipment shall be arranged. JCB Tower crane Props / jacks Loading platform (Pre

Loading Platform Erection, Assembling and Installation Method Statement Read More »

Civil Works Method Statements, Occupational Health and Safety
Collapse-of-bore-hole

Piling Problems and Risks During Execution Works

The following possible risks or problems are identified with the activities involved with pile execution. Survey – Out of Positioning of the Pile The pile position shall be cross-checked by the Engineer, Contractor and Sub Contractor before the installation of pile. If any out of position of the pile (more than the allowable tolerance) has

Piling Problems and Risks During Execution Works Read More »

Civil Works Method Statements
Method Statement For Installation of Galvanized Wire Mesh/Screen

Method Statement For Installation of Galvanized Wire Mesh/Screen

The purpose of this procedure is to define how wire screen /mesh installation works shall be carried out under controlled condition. This Method Statement describes the steps that will be followed for the installation of galvanized mesh / screen as per the approved shop drawing details, this procedure shall be read in conjunction with contract

Method Statement For Installation of Galvanized Wire Mesh/Screen Read More »

Civil Works Method Statements
error: Content is protected !!
Scroll to Top