project approvals procedure for construction projects

Project Approvals – Statutory and Regulatory Requirements for Construction Projects

This procedure describes the requirements on statutory approvals to ensure all necessary regulatory and statutory project approvals are obtained in a timely manner to support engineering activities, construction activities and project completion etc. The process related to statutory/regulatory project approvals is described below, all parties shall  allocate sufficient cost, time and resources for this activity […]

Project Approvals – Statutory and Regulatory Requirements for Construction Projects Read More »

Project Planning, Quality Management

General Sequence of Works in Preparation of Building Foundation Up To The Level Of Blinding Concrete

The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed and casting of foundations including column and lift pit footings. Prior to commencement

General Sequence of Works in Preparation of Building Foundation Up To The Level Of Blinding Concrete Read More »

Civil Engineering Methods, Project Planning, Quality Management, Technical Articles
Possible Cause of Road Crack and Defect - Road Maintenance Inspection Guide

Possible Causes of Road Crack and Defect – Road Maintenance Inspection Guide

Below you can find some major causes of road crack and road defects. The page also provides what are the effects if these road defects are not properly addressed. Alligator Cracking Alligator cracking is a series of interconnecting cracks creating interconnected patterns on the road. The cracks start at the bottom of asphalt surface and

Possible Causes of Road Crack and Defect – Road Maintenance Inspection Guide Read More »

Civil Engineering Methods, Roadworks
Steel Structure Building Construction Procedure

Steel Structure Building Construction Procedure

This procedure is useful for building construction based upon the steel structure erection work. Based on the design and specification, this document provides a proper step wise procedure and quality and safety management of the steel structure work. The following items/equipments are basic requirements  for building construction of steel structure works at a large scale

Steel Structure Building Construction Procedure Read More »

Construction Method Statements, Stainless Steel Fabrication
Road Pavement Construction Inspection Checklist

Road Pavement Construction Inspection Checklist

General road construction site inspection checks: Contractor has all necessary permits to work in road where applicable, i.e. Construction Permit, Insurance, Bonding etc. available. Safety to public considered: (barricades, covered walkways, etc. provided) Barricades available around excavations in street. Barricades available around stockpiled materials in street. Adequate detour signs to get the public through or

Road Pavement Construction Inspection Checklist Read More »

Roadworks
Aluminium Cutter Machine Operation Work Instructions

Aluminium Cutter Machine Operation Work Instructions

This page provides you steps for using the aluminium cutter machine. The instructions are explained using the images to understand easily. When cutting aluminium profiles, please wear hand gloves, ear muffs and safety glasses. Do not wear any kind of jewelry (rings, watches, bracelets etc.) in order to prevent scratching the aluminum end products and

Aluminium Cutter Machine Operation Work Instructions Read More »

Aluminium & Glass Work Methods
Control of Engineering Documents Procedure

Control of Engineering Documents Procedure for Quality Management System

This procedure describes the requirements on the control of engineering documents. This is an essential document control procedure that ensures all engineering drawings and related technical documents essential for completing the works, including shop drawings by vendors, manufacturers and subcontractors on Projects are duly registered, reviewed, approved and distributed in a controlled manner. Procedure of

Control of Engineering Documents Procedure for Quality Management System Read More »

Quality Management, Technical Articles, Templates

Lock Out Tag Out LOTO Construction Safety Isolation Procedure

This lock out tag out procedure shall help companies to establish a standard for the safe isolation of machinery, equipment and any other energy source which may need isolation by means of a lock-out tag-out LOTO system. Overall the project head / project manager is responsible for the implementation of this standard  hse procedure as

Lock Out Tag Out LOTO Construction Safety Isolation Procedure Read More »

Occupational Health and Safety, Technical Articles