Lead Acid Batteries Installation Operation & Maintenance

Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and preferably cool and frost-free location. Do not expose the cells to direct sunlight as damage to the container and cover may occur. As the batteries are supplied charged, storage time is limited. In […]

Lead Acid Batteries Installation Operation & Maintenance Read More »

Electrical Method Statements
split unit ac testing and commissioning

Split Unit Testing and Commissioning Method Statement

Below is a precise HVAC method statement that briefly explains testing and commissioning of split unit ac air conditioner. The test will be commenced after Split Unit installation and power supply panel T&C activities completed. All areas and fan inlet & outlet should be cleared of waste materials and any other obstruction. The purpose of

Split Unit Testing and Commissioning Method Statement Read More »

HVAC Method Statements, Testing & Commissioning

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs and approved material submittals. Prior to installation of drainage accessories, the supervisor  and

Drainage Accessories Installation Method of Statement Read More »

Plumbing Method Statements

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves

SCOPE OF WORK: This Method Statement describes the procedure for repairing the damaged outer jacketing of cables using wrap around heat shrinkable sleeves. TOOLS Cable preparation tools Cable manufacturer approved solvent Clean, lint free clothes Burning Torch Electrician’s tape Installation tools MATERIALS REQUIRED: The wrap around heat shrinkable cable sleeves used shall be as per approved

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves Read More »

Electrical Method Statements
Explosive Power Tools Operation Safety Instructions

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating manual and cartridge operating manual. Hazard Identification and Risk Assessment The introduction of

Explosive Power Tools Operation Safety Instructions Read More »

Occupational Health and Safety, Technical Articles
Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Sequence of Operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System

Below is detailed sequence of operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System. Primary/Secondary Chilled Water Pumps The secondary chilled water pump (SCHWP) sets will be controlled through VFD drives to maintain the desired system differential pressure. A minimum of 3 differential pressure transducers will be connected to the DDC controllers of

Sequence of Operation for Chilled Water Pumps, Pressurization Units & Chemical Treatment System Read More »

Building Management System, HVAC Method Statements
excavation measurement procedure

Method of Measurement for Structural Excavations

Measurement of Structural excavation will be limited to excavation for foundation for bridges, retaining walls, box culverts or cross sectional area exceeding 1 sq. mtr, box culvert wing walls, head walls, toe walls and aprons, manholes, pump houses and sub-stations. For box culverts 1 sq. mtr or less, pipe culverts, storm sewers and ducts, measurement