Diesel-Generator-Genset Mobilization Method

Method Statement for Mobilization of Diesel Generator Genset

Step 1: Electrical Circuit Isolation Isolate the main electrical connections and supply line from the gen-set. Cut off the main circuit breaker of the generator control panel to “stop”. Disconnect the electrical batteries connection from the genset. Disconnect the grounding cable from the battery. Step 2: Dismantling of Radiator Exhaust Ducts Mark the mating parts […]

Method Statement for Mobilization of Diesel Generator Genset Read More »

Electrical Method Statements
Filling-Core-Sonic-Pipes

Procedure for Filling Core Sonic Pipes

The following describes the procedure for filling core sonic pipes with cement grout. Prepare the mix as per the proposed mix design given below using following equipment’s: Mixer Piston Pump Grout hose of suitable length Grout Mix Design For Filling Core Sonic Pipes For Grout Strength 30N/mm2 Mix  Design OD Weights MSRC (Type II) 1420 kg/m3

Procedure for Filling Core Sonic Pipes Read More »

Civil Engineering Methods, Method Statement for Civil Works

Design of Reaction System for 1500 mm diameter Test Pile

The following are the main elements in the design of reaction system for 1500 mm diameter test pile.     Design of Reaction Anchor.     Design of Dywidag Bars.     Design of cross beam.   Anchor Design The test load                          

Design of Reaction System for 1500 mm diameter Test Pile Read More »

Civil Engineering Methods, Method Statement for Civil Works
Temporary-Retaining-Wall-Installation-Method-Statement

Method Statement for Temporary Retaining Wall Installation

The existing ground level varies between + 3.52 m DMD to + 4.29 m DMD. The working platform level for Double U wall is considered at the average ground level. A Double U channel beam wall with one layer of tie-back anchors shoring system is proposed along the four sides of the plot for a

Method Statement for Temporary Retaining Wall Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works
horizontal-bladder-tank-installation Method Statement

Method Statement for Horizontal Four Flange Bladders Installation in Tank

Visually inspect bladder for correct size and obvious defects such as perforations before starting. Lay bladder on a dry, clean surface such as a cleanly swept floor, tarp, etc. Smooth out all wrinkles and folds. Roll up the small flange necks at top and bottom of bladder, the use duct tape to tape securely so that they

Method Statement for Horizontal Four Flange Bladders Installation in Tank Read More »

Fire Suppression System
Collapse-of-bore-hole

Piling Problems and Risks During Execution Works

The following possible risks or problems are identified with the activities involved with pile execution. Survey – Out of Positioning of the Pile The pile position shall be cross-checked by the Engineer, Contractor and Sub Contractor before the installation of pile. If any out of position of the pile (more than the allowable tolerance) has

Piling Problems and Risks During Execution Works Read More »