2022
Dec
20

Method Statement for Excavation & Backfilling for Open Foundations / Footings

Below is a brief method statement that details general procedures to be followed for excavation & backfilling of foundations, Sub-structures & Trenches for any type of the construction and road project. The method covers survey works, excavation, backfilling, compaction and area cleaning

2022
Nov
17

Standard Requirements for Furnishing, Fabrication, and Placement of Reinforcement Including bars, welded wire fabric, Ties & Supports

Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

Below are standard specifications and quality control requirements for concrete reinforcement including tension, compression, and temperature reinforcing steel, including welded wire fabric, and epoxy coated reinforcing. The scope of work includes furnishing, fabrication, and placement of reinforcement for cast-in-place concrete, including bars, welded wire fabric, ties, and supports. Related

2022
Nov
6

Temporary Works Standard Safety Procedure

Temporary Works Standard Safety Procedure

The purpose of this procedure is to provide safework instruction for the safe erection, dismantling and structure design of temporary works. Definitions and Abbreviations Temporary Works: Any temporary structure required to construct a permanent structure or used to support a permanent structure.

2022
Oct
15

Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work

2022
Sep
28

Bored Pile (Cast-in-Situ) Construction Method Statement

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated

2022
Sep
8

Precast Post Tensioned Beam Installation Procedure

This civil method statement is prepared to state the proposed construction method for prestressing works and shall be, upon approval by the consulting engineer, distributed to all parties concerned so that the prestressing works can be carried out with the same information.

2022
Aug
31

Painting Standard Specifications for Enamel & Emulsion Painting Techniques

All paints to be used shall be those supplied by approved manufacturers. The quality of paints shall comply with MS 125 in respect of oil/ enamel paints and MS 134 in respect of emulsion paints/acrylic paint. Prior to commencement of the painting