PTW Permit To Work Standard Work Instruction

This standard work instruction describes the system to control potentially high risk operations through the issue of a Permit to Work (PTW). Procedure applies to all parties engaged under the control of main contractor on a construction project site. Permit to Work (PTW): Is a system which ensures that all essential precautions have been taken […]

PTW Permit To Work Standard Work Instruction Read More »

Occupational Health and Safety, Risk Assessment
Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of chilled water pressurization unit through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to the satisfactory level of

Chilled Water Pressurization Unit Testing & Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
cable connections and termination method statement

Method Statement For Cable Pulling and Final Electrical Connections To MV & LV Equipment

1. Purpose This Method statement covers the installation and final electrical connections to the MV and LV equipment at any electrical project site. All the electrical installation work will be in accordance with the project electrical specifications. 2. Scope of Work This procedure covers the method for all the cable pulling, electrical connections and terminations for

Method Statement For Cable Pulling and Final Electrical Connections To MV & LV Equipment Read More »

Electrical Method Statements

Permit to Work PTW System General Requirements and Improvement Plan

This document is prepared to provide a clear explanation about PTW issuance and to exemplify the PTW required activities at a construction or any other kind of project, the process involves detailed risk assessments on site activities conducted by main contractor in coordination with its subcontractors. Permit to work system is very important tool for

Permit to Work PTW System General Requirements and Improvement Plan Read More »

Occupational Health and Safety, Risk Assessment
Copper Piping Method Of Statement For Installation

Copper Pipe Joint Method Statement | Flaring & Swaging

The purpose of this method statement is to establish a standard procedure for the proper cutting and jointing of copper pipe by using the right tools and procedure i.e. flaring or swaging joints. Below method will also serve as guideline for newly hired employee which will be dealing with air conditioning unit maintenance activity or

Copper Pipe Joint Method Statement | Flaring & Swaging Read More »

HVAC Method Statements, Method Statements, Piping Method Statements

Transformer Installation Method of Statement for any type of Project

Below electrical method statement explains and covers the transformer installation procedure for any kind and size of the project. By following this method of statement the electrical installation team shall ensure that installation of transformer is done as per the applicable specifications, codes and standards also ensuring the compliance with the manufacturer installation manuals/instructions. Necessary

Transformer Installation Method of Statement for any type of Project Read More »

Electrical Method Statements, Method Statements

Transformer Testing & Commissioning Method Statement

Below is a standard electrical method statement which can be used as reference to prepare further detailed method statement for testing and commissioning of transformers. Below is list of necessary tools for transformer testing & commissioning. Portable Hand Tools / Tool Box. Digital Multimeter Earth Resistance Tester Megger Tester. Safety requirements tools such as safety

Transformer Testing & Commissioning Method Statement Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning