Author Archives: Web Master

Testing & Commissioning Report SMDB

COMMISSIONING RECORD SHEET : SMDB Project: Panel Location: Panel Ref.: Sheet of Rev. CIRCUIT DETAILS COLD TEST LIVE TEST Circuit No. Circuit Designation Cable (mm2) ECC (mm2) No. of Cores MCCB Amps MCCB Type MCCB (kA) ELCB Rating Insulation Resistance (MΩ) Ring Zs act. (Ω) Energized (Date) ELCB (mS) R-Y R-B Y-B RYB-N RYB-E N-E… Read More »

Continuity & Insulation Resistance Testing Report

INSTALLATION & TEST REPORT Project      : Doc Ref No   : Test Instrument (Serial NO.s) SCM Ref No : Tested By     : Continuty tester               : Fed From  : Date             : Insulation Tester              : SCM Ref No Circuit Ref No Phase & Neutral Size (mm²) Circuit Name Contuinity Test (Ohms) Insulation resistance test (Mohms) polarity R1 +… Read More »

Testing & Commissioning Report For Fire Alarm System

Fire Alarm system includes Fire detection and alarm system. Manufacturer for the Fire Alarm system is Simplex -USA. Fire Alarm system devices are UL and ULC listed and meets NFPA 70, Article 250, NFPA 72, NFPA 780 & EN 60 8 49 standards. The Panel used is Simplex model 4100ES with processor capacity of 2500 points… Read More »

Download Method Statement For Installation of Sump Pumps

Download Method Statement For Installation of Sump Pumps Now you can Download Method Statement For Sump Pump Installation   Download package contains the Method Statement + Checklist for Installation + Inspection & Testing Plan + Risk Assessment.   You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from… Read More »

Download Method Statement For Installation of Cooling Towers

Download Method Statement For Installation of Cooling Towers Now you can Download Method Statement For Cooling Towers   Download package contains the Method Statement + Checklist for Installation + Inspection & Testing Plan + Risk Assessment.   You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from… Read More »

BUILDING MANAGEMENT SYSTEM BMS SPECIFICATIONS & SCHEDULE

Generally the BMS system consists of the microcomputer based remote control panels interfacing directly with sensors, actuators and environmental delivery systems (i.e., HVAC equipment, lighting systems, ). The BMS also interfaces with the chiller plant automation panel where applicable. The system shall have an inbuilt spare capacity of minimum twenty percent at all levels of… Read More »