uPVC High Pressure Water Supply Piping System Installation Procedure

Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of shop drawings, technical submittals, inspection and test plans are in the work place […]

uPVC High Pressure Water Supply Piping System Installation Procedure Read More »

Method Statements, Plumbing Method Statements, Pressure Testing

Fire Pump Installation Method Statement

Below is a precise method statement for fire pump installation, each project will have its own specific method of statement for installation of fire pump. Follow the manufacturer’s instructions while installing the fire pump. Pump shall be stored on a flat surface in well-ventilated storage area. Inlet and outlet flange blanks shall not be removed

Fire Pump Installation Method Statement Read More »

Construction Method Statements, Method Statements, Plumbing Method Statements

LPG Storage Tank & Containers Standard Requirements

Containers shall be designed, fabricated, tested and marked (or stamped) in accordance with the Regulations of the U.S. Department of Transportation (DOT), the “Rules for the Construction of unfired Pressure Vessels”, Section VIII, Division 1, ASME Boiler and Pressure Vessel Code, or the API-ASME Code for unfired Pressure Vessels for Petroleum Liquids and Gases applicable

LPG Storage Tank & Containers Standard Requirements Read More »

Technical Articles
water spray system installation method statement

Water Spray Firefighting System Installation Method Statement

Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job: Water Spray Nozzle – High Velocity Deluge Valve, OS & Y Valve Electrical Devices Pipe Wrenches Hammer Chisel

Water Spray Firefighting System Installation Method Statement Read More »

Construction Method Statements, Method Statements, Plumbing Method Statements
distribution board testing procedure

Main Sub-Main Distribution Boards Testing and Commissioning Procedure

Method Statement For The Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution Boards (DB) and Consumer Units(CU) TESTING, COMMISSIONING AND START UP PROCEDURES Upon completion of equipment installation and prior to carrying out test runs, the Contractor shall visually inspect the installation and satisfy that the equipment has been

Main Sub-Main Distribution Boards Testing and Commissioning Procedure Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
main-distribution-board MDB Testing Procedure

Main Distribution Board MDB Testing & Commissioning Procedure

Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded in prescribed format. There are 3 cases to be considered. Case 1 is

Main Distribution Board MDB Testing & Commissioning Procedure Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

Condensate Water Filter Installation Method Statement

The Condensate Water Filter (Side Stream/ Multimedia) are compact filtration packages for the removal of grit, airborne particles and scale from cooling tower water in order to avoid system fouling. A licensed and/or trained/experienced plant electrician and millwright-pipe fitter should install this packaged system. Ensure that the concrete pad is level and structurally sound to

Condensate Water Filter Installation Method Statement Read More »

HVAC Method Statements, Method Statements, Piping Method Statements, Piping Works

Installation Method Statement for Crane Gem Rubber Lined Butterfly Valves

These instructions relate only to Crane Gem rubber lined Butterfly valves, which are designed and manufactured to provide isolation, or can be used for regulation, of flow of suitable fluids. Valves must be installed into a well-designed system and it is recommended that the system be inspected in accordance with the appropriate member state legislation.