2024
Apr
16

Occupational Health and Safety Procedure for Chemicals and Hazardous Substances

Occupational Health and Safety Procedure for Chemicals and Hazardous Substances

Below is an important workplace health and safety procedure related to COSHH, that details the requirements for the establishment and maintenance of local registers for the control of chemicals and hazardous substances. Project head in coordination with all site staff and HSE

2024
Apr
11

Central Battery Emergency Lighting System – Electrical Installation Method Statement

This document describes the methodology for the installation of emergency Lighting central battery System in any kind of project. Following this electrical installation method shall ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution

2024
Apr
1

MV Switchgear Installation Method Statement

This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to ensure that all MV/LV switchgear and panels site assembly, installation, final connection and workmanship is correct and acceptable

2024
Mar
30

Driven Piles Installation Method Statement

Driven Piles Installation Method Statement

The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works. Piling contractor shall maintain and provide all the record for each pile driven. Handling and Storage of Piles The piling

2024
Mar
27

Mechanical Engineering Interview Questions and Answers

Air Handling Unit AHU FAHU Testing and commissioning Method Statement

Below we have given around 70 questions and answers that can be helpful for mechanical engineer interview.  Q.1) What is the Unit of Heat? Units: BTU (British Thermal Units) 1BTU: It is the amount of energy required to raise 1 Degree Fahrenheit

2024
Mar
24

Best Sanitary Installation Method Statement

Best Sanitary Installation Method Statement

This document describes best method for the sanitary installation to ensure that the installation works are conducted in compliance with the approved design, drawings and material submittals. Prior to the installation of Sanitary Wares, the supervisor and foreman will verify and ensure

2024
Mar
17

Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base

Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base

Below is a precise roadwork method statement that covers construction of embankment including soil stabilization and sub base preparation, with material obtained from approved borrow areas or suitable material obtained from roadway excavation and drain excavation etc. The embankment construction work shall

error: Content is protected !!