Below is an important workplace health and safety procedure related to COSHH, that details the requirements for the establishment and maintenance of local registers for the control of chemicals and hazardous substances. Project head in coordination with all site staff and HSE
Read Complete Method
This document describes the methodology for the installation of emergency Lighting central battery System in any kind of project. Following this electrical installation method shall ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution
Read Complete Method
Risk management as understood by its name is process of managing the risks, that involves first identify, assess and prioritize the risks and then implement the coordinated measures and/or resources to eliminate, minimize and monitor the probability and impact of the unwanted
Read Complete Method
This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to ensure that all MV/LV switchgear and panels site assembly, installation, final connection and workmanship is correct and acceptable
Read Complete Method
The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works. Piling contractor shall maintain and provide all the record for each pile driven. Handling and Storage of Piles The piling
Read Complete Method
Below we have given around 70 questions and answers that can be helpful for mechanical engineer interview. Q.1) What is the Unit of Heat? Units: BTU (British Thermal Units) 1BTU: It is the amount of energy required to raise 1 Degree Fahrenheit
Read Complete Method
This document describes best method for the sanitary installation to ensure that the installation works are conducted in compliance with the approved design, drawings and material submittals. Prior to the installation of Sanitary Wares, the supervisor and foreman will verify and ensure
Read Complete Method
Below is a precise roadwork method statement that covers construction of embankment including soil stabilization and sub base preparation, with material obtained from approved borrow areas or suitable material obtained from roadway excavation and drain excavation etc. The embankment construction work shall
Read Complete Method