The purpose of this method statement for reinforcement works is to lay down the systematic procedures for the various activities required for installation of reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings, bar
Read Complete Method
Below is a precise method statement for electrical wiring installation for any kind and size of project. This work method statement explains and covers the wiring through conduits and its termination to the equipment / boards etc. Required Tools Pulling Rope Lubricant
Read Complete Method
There are many different welding processes, but the most commonly used in the construction industry are gas welding and electric arc welding. In order to ensure that all welding works takes place in a safe manner, the suitability of the following should
Read Complete Method
The purpose of this electrical method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant ATS operators manual and User’s guide. By
Read Complete Method
Purpose of this mechanical work procedure is to provide guide lines to carry out underground piping fabrication and laying and to ensure that proper quality control and documentation are maintained at project site. The scope of this procedure covers fabrication, installation and
Read Complete Method
Below is a precise and best method of statement that is applicable for installation, testing & commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The scope of works includes the delivery to site,
Read Complete Method
The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for installation of wiring devices & ceiling rose for electrical system through the guidelines contained herein so as to ensure that the
Read Complete Method
This document covers the sequence of activities for Fabrication, Erection and Installation procedure for Metallic Piping (Carbon Steels, Stainless Steels, Nickel Alloys) systems and to ensure the compliance to the above activities with the contractual applications, applicable standards and HSE requirements. Below
Read Complete Method