2023
Jul
10

HVAC System Volume Control & Fire Damper Installation Method Statement

HVAC System Volume Control & Fire Damper Installation Method Statement

Unless otherwise specified, all the dampers and duct accessories installation shall be according to the approved shop drawings and contract mechanical specifications. Drawings, plans, schematics and diagrams indicate general location and arrangement of ductworks, install the dampers as indicated unless deviations to

2023
May
10

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI)

Method Statement for Condensate Drain Piping Installation Insulation & Testing (UPVC + GI)

This method statement covers on site installation of all condensate UPVC pipes for fan coils drains and galvanized pipework for AHU drains, including supports, expansion and anchor points for the condensate drainage system and insulation of the galvanized steel and upvc pipework.

2023
May
2

Method Statement for Installation of Central Battery System

Method Statement for Installation of Central Battery System CBS

The following procedure will be followed for installation of Central Battery system and can be customized as per the specific needs for different projects. Emergency lighting battery system shall be of modular construction with all modules being plug in type encapsulated design. The

2023
Apr
11

Method of Statement for Installation of Power / Electrical Bus bar

Method of Statement for Installation of Power / Electrical Bus bar

Busbars installation shall be done in accordance with approved shop drawings and properly coordinated with Site Engineer’s for the exact locations and levels.  Before starting the installation of power electrical busbar following tools shall be arranged: Tower Crane / Fork Lift for

2023
Feb
26

Water Leak Detection System Testing & Commissioning Method of Statement

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case

2023
Feb
7

Mobile Heavy Equipment Recovery Standard Procedure

The purpose of this procedure is to safely recover mobile equipment that may have been bogged, overturned, suffering from mechanical/structural failure, slipped over an edge or into a culvert, or similarly immobilized. It provides instruction for recovery operations that require the use

error: Content is protected !!