Author Archives: Web Master

Inspection Checklists / Forms For Electrical Works Installation Testing & Commissioning

Below are the links for downloading the sample inspection and testing check sheets and forms which you can use for conducting the inspection of different electrical systems and activities. You can make your own forms based upon the information given here. Please visit the download link given below the list. Installation of Exposed Conduit Installation… Read More »

Ceiling Spray Plaster Works Method Statement

Below is precise civil work method statement that details general procedure to be followed for ceiling spray plaster works at any kind and size of project. The procedure includes preparatory works & method of ceiling spray application. Arrange below tools and equipment before starting the ceiling spray paint and spray plaster activities: Wire brush Skimmer… Read More »

Water Chiller Installation Method Statement

Below is a standard method statement or procedure which can be used for installation of water chiller on its foundation after it is delivered on the sites. Before starting the activity of chiller installation following tools/equipment shall be arranged: Tool Box Lifting Equipment (Cranes) Electric Drill Machine Ladders Threading Machine Welding/ Brazing Machine (if required)… Read More »

Installation of Glazed Aluminum Curtain Wall & Composite Cladding

You can find a very good method statement on this page for the installation of Glazed Aluminum Curtain Wall, Skylight & Composite Cladding works. Installation will be carried out in accordance with project specifications and approved shop drawings. MEP clearance shall be obtained and site dimensions shall be verified before start of any activities on… Read More »

Method Statement for Hydrostatic Testing of Metallic Pipework

The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at the project and to be followed for all piping works at site. Prior… Read More »

Hot Water Calorifier Testing and Commissioning Method Statement

This method statement is applicable for the testing and commissioning of hot water calorifier or water heater for any kind of building or projects. Arrange below tools before start of the work: Electrical Toolbox Box spanner set Pipe wrench Pre Commissioning Requirements Before commencing the testing and commissioning of calorifier the following shall be carried… Read More »