This method statement describes in detail the installation of fire protection services at any project. The procedure covers the following activities that are also supported by the diagrams and illustrations. Fire Protection Riser Pipe Installation Rigid Coupling Installation Mechanical-T Installation Flexible Coupling
Read Complete Method
This page is providing you some important guidelines for installing and maintaining the Y-Strainers. These tips shall help you in achieving the quality work and right first time. If you want to read a full method statement for strainer installation you can
Read Complete Method
You can use below procedure for glass cutting in a glass factory that utilizes automatic glass cutting machine. Switch ON machine. Check the condition of switch. Operate to lift cutting table. Table will travel to procure glass and return to feed to
Read Complete Method
Unless otherwise specified, all installation shall be in accordance to approved shop drawings and contract specifications. Drawing plans, schematics, and diagrams indicate general location and arrangement of Fan Powered Box units. Install Fan Powered Box as indicated unless deviations to layout are
Read Complete Method
Storm water drainage is an important system for any project. This Method Statement covers the installation of Sanitary, Vent and Storm water drainage piping installation. This storm drainage installation procedure is to define the method used to ensure that drainage and vent
Read Complete Method