2020
Dec
31

Method of Statement for Pneumatic Testing of Distribution and Process Piping System

Process Pipe Pneumatic Testing Manifold Connection Diagram

The scope of this method of statement is to define the methodology for pneumatic pressure testing of any kind of distribution or process piping system. During the activity and works, there will be continuous communication arrangement among all parties i.e. Project Management

2020
Dec
16

Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

This method provides you guidelines for the safe use of aluminum mobile scaffolds and standard instruction applies to all applications where people are using aluminium mobile scaffold towers. Overall project manager and HSE manager are responsible for the implementation of this standard

2020
Nov
17

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to

2020
Nov
8

Download HVAC Maintenance Procedures & Schedules in Editable Formats

HVAC Preventive Maintenance Service and Troubleshooting Tips

Now you can download complete package for HVAC maintenance works. We are providing editable method statements and procedures that can help you for conducting the planned maintenance of all hvac mechanical equipment’s and systems. Preventive maintenance is an essential part of any

2020
Nov
2

Occupational Health and Safety Recognition Award Scheme

Occupational Health and Safety Recognition Award Scheme

This document describes the guidelines on the HSE recognition and awards scheme for a company or organization. Through the health and safety award scheme occupational safety and health administration recognizes efforts made by the employees, partners and sub-contractors in achieving high standards