2021
May
30

Method Statement for Casting of Capping Beam for Shoring Piles

Method Statement for Casting of Capping Beam for Shoring Piles

The purpose and aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the capping beam work in compliance to standard and good practice at all stages and activities in the construction of

2021
May
18

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

This plumbing method statement covers the nature and type of work for drainage outlets stainless steel shower gullies for the project as per site requirements. Method statement also covers frequency of which inspections are to be carried out. All documentary requirements for

2021
Apr
11

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

Shuttering Method Statement for Safe Erection, Operation and Dismantling of Slip Form Shutter

The objective of this method statement is to set down the procedures that are involved in the safe erection, operation and dismantling of a slip form shuttering, applicable for the construction of core for the project building. Roles and Responsibilities Project manager

2021
Mar
16

Water Leak Detection System Installation Method of Statement

Water Leak Detection System Installation Method Statement

This “Method Statement” covers the nature and type of work for Water Leak Detection System installation as per approved material submittal and project specifications and legal requirements. MEP project manager have full authority and overall responsibility to manage, supervise, control the works

2021
Feb
17

Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control

Occupational Health and Safety Procedure for Roof Work Hazards and Risk Identification and Control

Most accidents from roofs could have been prevented by the identification of hazards and by the provision and proper use of readily available equipment. As a high risk activity, it is important that all roof work is pre planned. Falls and falls

2021
Feb
7

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure

Bulldozer and Excavator Track Replacement Standard Procedure

Below is the standard procedure that is helpful for project maintenance team for maintenance and track replacement for bulldozers and excavators. This instruction shall apply to all track replacement operations and other preventive maintenance actions for bulldozers, graders and excavators under the

2021
Jan
16

Confined Space Definition Entry & Working Procedure

confined space entry hazards and training requirements

The purpose of this safework method is to assist the organization in the identification and establishment of  standard procedure for the safe entry and work in confined space. This document addresses safety instructions for both projects and offices of the company. Additional

2020
Dec
31

Method of Statement for Pneumatic Testing of Distribution and Process Piping System

Process Pipe Pneumatic Testing Manifold Connection Diagram

The scope of this method of statement is to define the methodology for pneumatic pressure testing of any kind of distribution or process piping system. During the activity and works, there will be continuous communication arrangement among all parties i.e. Project Management