The scope of this procedure covers methods of concrete curing to achieve specified strength and durability parameters of concrete. Procedure for concrete curing on a project site will vary depending on the type, exposure, location and design mix. It is advised to
Read Complete Method
Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs
Read Complete Method
This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when
Read Complete Method
The purpose of this office hse procedure is to ensure that all offices are designed to mitigate risk and maintained to ensure the safety of staff and visitors. This office safety procedure is applicable for all kind of head/corporate/admin offices including project
Read Complete Method
The road maintenance contractor shall be responsible for undertaking all routine maintenance of the existing road and all bridges on the road from the day the road is officially handed-over to the client until the issue of Defects Liability Certificate by the
Read Complete Method
This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is
Read Complete Method
A ladder is a simple, versatile and relatively inexpensive piece of equipment to use on a construction project or at home level. The temptation therefore is to use it for all sorts or work without considering whether the risk warrants an alternative
Read Complete Method
Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall
Read Complete Method